Laserfiche WebLink
Regular City Council Meeting <br /> Monday,August 22,2011 <br /> Page 21 <br /> ture requests. Ms. Bloom advised that the cost estimate provided by Excel Ener- <br /> gy to relocate the poles would be approximately $5,000 each due to the current <br /> undergrounding of two (2) private utility services to those poles. Ms. Bloom ad- <br /> vised that staff would be available reloatin the poles at Xcel Energy <br /> expensef the property <br /> owner(s) were interested in relocating <br /> Mr. Hadlich,2782 Dale Street <br /> Mr. Hadlich thanked staff for their work to-date and the City Council for their <br /> consideration; and commended the City and its engineering staff on the successful <br /> Dale Street project to-date, and opined that it would be of great benefit to their en- <br /> tire area. <br /> When originally talking to Ms. Bloom about the Dale Street project, Mr. Hadlich <br /> concurred with Ms. Bloom's comment that it was thought the poles would need to <br /> be relocated. Mr. Hadlich noted that the pole should have been moved in 2000 <br /> when his home had been built by Tramm Builders and at which time there would <br /> have been no cost to move them. Mr. Hadlich opined that this would have simply of the <br /> been an additional cost of approximately mal w�000 P t between the two wo (�model <br /> homes construction costs, and <br /> homes being built. <br /> In consideration of future situations, Mr. Hadlich asked that the City consider an <br /> ordinance stating that, when parcels are split, the power poles will be moved to <br /> the outer lot line. Mr. Hadlich offered to provide his research of other communi- <br /> ties who have such a policy. Mr. Hadlich further requested that the City consider <br /> the aesthetic value to the community in pursuing undergrounding of utilities <br /> throughout the City, opining that it would increase property and home values con- <br /> siderably. Mr. Hadlich further opined that he didn't see opposition from the <br /> community at large if the fees for undergrounding utilities were done systemati- <br /> cally and spread throughout the community for the betterment of all. <br /> At the request of Mayor Roe as to Mr. Hadlich's intent moving forward since nei- <br /> ther Xcel Energy or the City were going to pay for relocation of the pole, Mr. <br /> Hadlich responded that he would have gladly paid for it when he first purchased <br /> the home, at a cost of approximately $1,000; however, now that he had already <br /> invested over $3,000 to underground their electric service line, an additional cash <br /> allotment of$5,000 was a much larger and more complicated consideration. <br /> Councilmember Willmus questioned how frequently Xcel Energy replaced the <br /> poles; with Ms. Bloom offering no concrete response on that timing. Council- <br /> member Willmus questioned if the pole could be relocated at that time. <br /> Ms. Bloom responded that there were several possible scenarios: one being that, <br /> with current City ordinance now in place related to rights-of-way and any future <br />