Laserfiche WebLink
Proposed Expenditures: <br /> At the present time,we need a new fire station, partly because of delayed maintenance on our <br /> buildings and partly because of the changing nature of the fire force(i.e. including women). A citizen's <br /> panel has decided that locating the new station on the City Hall Campus provides the best overall <br /> coverage and allows us to extend the geothermal system on the campus to reduce maintenance costs <br /> for the heating and cooling of the new building. It is possible that the cost of a new building could be <br /> reduced by utilizing another vacant or underutilized site elsewhere, but that does not seem feasible at <br /> the moment and the campus location for the station is a good central site for what will hopefully <br /> become a "fire district"of resources shared between Roseville and its immediate neighbors on all sides. <br /> This station will cost approximately 8 million dollars and result in a debt service of around 1 million <br /> dollars. This cost equates to about$2.50 per month,per household. As this does not require a change <br /> in personnel over our present staff,this should be a close estimate to the actual and ongoing costs. <br /> We have undertaken,over the past three years,a very ambitious planning project to upgrade our parks. <br /> The Master Planning process was begun before the economy collapsed, but has continued with the <br /> hope that the economy will recover. We are now considering a request for a 19 million dollar bond for <br /> the implementation of the first phase of this project. This project includes more trails and pathways as <br /> well as six new buildings to serve as"neighborhood gathering places," upgrades to playground <br /> equipment,fencing,tennis courts,etc. This bond would add about$5.00 per month, per household. <br /> Unlike the fire station, however, portions of the implementation plan will have ongoing maintenance <br /> and staffing costs,costs which should be calculated and included in considerations. If we build six new <br /> buildings to be gathering centers and warming houses,they will need rest rooms, heating and cooling, <br /> lighting, maintenance,and staffing. They will be of no value if they are not staffed,cleaned,and <br /> maintained. If they are not staffed,they cannot be open. If they are not open,they cannot be used. <br /> Thus,we must also decide how much these costs will add to the operating budget. The same is true of <br /> the pathways requested. They must be maintained to be of use. People want to use the trails to get <br /> outside and walk, not just in the summer, but in the winter as well. These maintenance costs must be <br /> included in the operating budget and as a discussion item when considering the"actual"cost of capital <br /> improvements we add to the city. <br /> Note: Since the most requested item in the survey was pathways,trails,and bike paths, it is very <br /> difficult to support the proposed cut to Public Works for funding maintenance of the pathways we <br /> already have. And,while Parks and Recreation included the pathways(as 18.4%of their total proposal <br /> costs)there is no acknowledgement of the required maintenance,a cost that will be added to our <br /> operating expenses. <br /> What should we do? <br /> I believe that we could increase the levy to gain the$5.00 per month per household by the method <br /> under statute and set up by our financial department. We could raise the utility fees by$1.00 per <br /> month to establish the funding for 1.2 million dollar per year replacement and maintenance of our <br /> existing water and sewer infrastructure. This could be handled by Chris so that the funding for the one <br /> additional engineer to handle this major ongoing need is covered somewhere in the budget. <br /> Page 3 of 5 <br />