My WebLink
|
Help
|
About
|
Sign Out
Home
2011-09-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-09-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2011 3:54:22 PM
Creation date
9/22/2011 3:44:00 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
9/27/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: September 27, 2011 Item No: 4 <br />Item Description: Communication Items <br />Projects update- <br />• Check for City Construction project updates at: www .citvofroseville.com /nroiects <br />• 2011 PMP- The Contractor has completed the base paving and sidewalk on Dale <br />Street between County Road C and South Owasso Blvd. Fianl lift of asphalt <br />should be places the week of the 26th. Paving has been completed on all of the <br />segments of the mill and overlay streets. Weekly updates are available at <br />www. cityofroseville.com \Dale Street & <br />www. cityofroseville. com \streetmaintenance. <br />• Rosewood Neighborhood Drainage Improvements: The Contractor is working on <br />punchlist items. <br />• Applewood Pointe -The Contractor is nearly complete with the infrastructure work <br />for this season. Final lift of asphalt will be places in the Spring. <br />• Rice Street Project: All newly constructed ramps on the new interchange are now <br />open. Final work is continuing on the permanent signal systems, median <br />construction, and sidewalk construction. The bridges, pond construction, final <br />paving, staining of concrete, and other restoration work should be complete by <br />late September to mid October. <br />• Fairview Pathway (NE Suburban Campus Connector)- the Contractor is <br />scheduled to start construction on this project in Mid September. <br />• Drainage Improvements- Staff is working on identifying segments to include in a <br />2012 drainage improvement project. <br />• Josephine Woods — Work is scheduled to begin soon on the site grading and <br />underground utilities. <br />• Budget process update <br />• RCL Organized Collection Meeting comments <br />• Other <br />Recommended Action: <br />None <br />Attachments: <br />A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.