Laserfiche WebLink
A <br /> 3. The County shall install or cause the installation of the traffic control signals with street lights, <br /> signs, interconnect, EVP System and Geometries in accordance with the plans and specifications for <br /> Project at Rice Street and South Owasso Blvd. The County, Roseville and Little Canada will participate in <br /> the construction costs based on the attached participation cost summary sheet (Exhibit "A") and as <br /> follows: <br /> a) Rice Street and South Owasso Blvd: the traffic control signals with street lights will be 50 <br /> percent County, 25 percent Roseville and 25 percent Little Canada. Construction costs for <br /> overhead mast arm mounted signs, interconnect and geometrics will be 100 percent <br /> County. The EVP system construction costs will 50 percent Rosevilfe and 50 percent <br /> Little Canada. <br /> b) Mobilization and traffic control is included in the project as separate items. The costs for <br /> each of these items will be 72 percent County, 14 percent Roseville and 14 percent Little <br /> Canada. <br /> 4. The County shall acquire right-of-way in accordance with the plans for the project at Rice Street <br /> and South Owasso Blvd at the County's cost and expense. <br /> 5. Roseville and Little Canada shall jointly be responsible for the installation of an adequate electric <br /> power supply to the service pad including any necessary extensions of power lines. Upon completion of <br /> the traffic control signals with street lights and EVP system installation, Roseville shall receive the <br /> monthly electric bill and invoice Little Canada 50 percent of the cost. In accordance with the Policy for <br /> lighting County Roadways, County Board Resolution 78-1394, Roseville shall maintain and pay energy <br /> costs of the integral street light in the southwest corner and Little Canada shall maintain and pay energy <br /> costs of the integral street light in the northeast corner <br /> 6. Upon completion of the traffic control signals, the County shall maintain and keep in repair the <br /> traffic control signal including relamping, cleaning and painting at its cost and expense. <br /> 7. Upon completion of the project, the County shall maintain and keep in repair the interconnect and <br /> overhead mast arm mounted signs at its cost and expense. <br /> 8. Upon completion of the project, the County shall maintain and keep in repair the geometrics on <br /> County owned roadways at its cost and expense and Roseville and Little Canada shall maintain and keep <br /> in repair the geometrics on City owned roadways at its cost and expense. <br /> 9. Upon execution of this agreement and a request in writing by the County, Roseville and Little <br /> Canada shall advance to the County an amount equal to their portion of the project costs based on the <br /> actual bid price plus six percent (6%) of such amount for the each share of the cost for engineering and <br /> inspection. <br /> 10. Upon final payment to the contractor and computation of the Roseville and Little Canada share for <br /> the work provided for herein, that amount of the funds advanced by each City in excess of Roseville and <br /> Little Canada final share will be returned to each City without interest and Roseville and Little Canada <br /> agrees to pay to the County that amount of its final share which is in excess of the amount of the funds <br /> advanced by each City. <br /> P W2000-02 <br /> 2 of 6 <br />