Laserfiche WebLink
olt4 111110 GRADING <br /> wa& 11111F ROAD CONSTRUCTION <br /> ff e4aftaa&eq�r '90ect SEWER &WATER <br /> mill, EQUIPMENT RENTAL <br /> 14777 LADE DRIVE <br /> FOREST LADE., MN. 55025 <br /> PHONE 6 5 1/464-450 0 <br /> April 21, 1999 FAX 6511464-4722 <br /> To: City of Roseville <br /> FROM: Forest Lake Contracting, Inc. <br /> RE: T.H. 36 Proposed Construction Schedule <br /> State Project No. 6212-141 <br /> Stage Day Night <br /> Time Period Work Work <br /> neral Description <br /> ---------------- -------------------------------------------------------------- <br /> Stage 1 ravemenzt Removal Shoulder & Paver..ent <br /> Mid April through Mid May. Clear & Grub Trees Earthwork, scraper <br /> Temporary construction on W.B. 36 Earthwork Gravel Operations <br /> widening and Dale St. Bridge Gravel Operations Signing & other Traffic <br /> by-pass construction. Bituminous Paving Control Devices <br /> Traffic not disturbed Traffic Control Bituminous Waving <br /> Devices <br /> Stage 2A Remove Bridge Normal �iighway construction <br /> Mid May through first part of DrIve Filing for activities are not <br /> August. E.B. 36 Bridge scheduled but may occur <br /> Dale Street Bridge Removal, All other activities to }peep the project on <br /> T.H. 36 E.B. demolition and associated with and schedule. we will not <br /> permanent construction. necessary for normal remove old bridge or drive <br /> Traffic on W.B. 36 by-pass and on road construction piling at night. <br /> Dale Street Bridge by-pass <br /> Stage 2B Continuing normal No work is scheduled., but <br /> First of August through Mid August road & bridge may be necessary to keep <br /> Temporary widening construction constructior* on schedule. Also may do <br /> or, E.B. 36-. activities. work which is adjacent <br /> Traffic split on W.B and E.B. 36 to the traveling lanes on <br /> and on Da-le St-A_, Bridge B �--pass 4 T.B. . <br /> Stage S Continuing normal No work is scheduled, but <br /> Mid August through Mid October road & bridge may be necessary to remain <br /> Build G .B. 36 Permanent, remove construction on schedule. <br /> Dale Bridge By-pass. activities. <br /> All traffic on widened E.B. 36. <br /> Stacie 4 pavement Removal, Removal operations and <br /> Mid rOctober through first of Nov. 'Truck excavation, excavation of temporary <br /> Remove all temporary work Pavement barking widening an E.B. 36 <br /> Traffic back on permanent E.B. and Traffic adjacent to traveling lanes <br /> and W.B. 364 Control Devices. <br /> AN EQUAL OPPORTUNITY EMPLOYER <br />