Laserfiche WebLink
addition,the radius of the roadway between the senior housing building and the <br /> existing church appears to be too tight to accommodate the City's fire equipment. <br /> The location and height of the canopy compounds this problem. <br /> 8. The project as proposed includes 163,530 square feet (3.75 acres) of impervious <br /> coverage, including 47,080 square feet of buildings and 116,450 square feet of <br /> pavement(driveways and parking). with a site area of 8.24 acres,this results in an <br /> impervious lot coverage percentage of 4596. <br /> 9. The amount of parking provided on site should be the minimum needed at this <br /> time. Based on a seating capacity of 500 (sanctuary and gathering space - <br /> simultaneous services), a minimum of 143 parking spaces are required for the <br /> church use(1 space per 3.5 seats). The 56 underground parking spaces combined <br /> with the 28 spaces between the senior housing building and the church meet the <br /> 1.5 space per unit requirement for senior housing,with the joint use of the church <br /> lot providing any required overflow parking. lather than including all 191 spaces <br /> at this time,the size of the parking lot should be reduced to 143. The parking lot <br /> could then be expanded to provide additional parking as the church grows. The <br /> Darks and Recreation Commission expressed a strong interest in having a joint <br /> parking arrangement between the parking area on the south side of the property <br /> and the park parking lot to the south. At a minimum, direct pedestrian access <br /> should be provided between these two parking lots. <br /> 10. Traffic generated from the senior housing project is estimated at less than three <br /> trips per day per unit, or 170 trips per day total. Both Victoria and County Road <br /> C have capacity for this small number of trips. <br /> 11. his an alternative to the current proposal, owners of the Huberty property could <br /> subdivide the l-1 site into five or six single family lots with a new road serving <br /> both the church and the Huberty site. Single family lots on this side slope would <br /> require substantial re-grading new utility excavation and road work to each site. <br /> Such a proposal would put residential backyards,decks,sheds,and other exterior <br /> improvements adjacent to the parr with no shared public parking or access. I <br /> summary, the amount of soil and vegetation disturbance may be similar to the <br /> proposed construction of the parking lot, but the amount of surface to be <br /> replanted in residential yards would significantly exceed the proposed parking lot. <br /> 1 . The Comprehensive plan and City housing policies support the location of a senior <br /> housing facility in this location;however,the proximity of the building to Central <br /> Park will have an impact on the parr. The plans for the private property submitted <br /> 'th the application include steep slopes, extensive use of retaining walls, and <br /> removal of existing vegetation on the project site. The trees removed during <br /> grading will need to be replaced and the grading plan should be modified to <br /> include gentler slopes and fewer retaining walls. In addition,the applicant should <br /> be required to preserve quality trees and vegetation wherever possible during site <br /> development. The landscape plan should also be modified to include additional. <br /> screening of the building and retaining walls to soften the view from Central Park <br />