My WebLink
|
Help
|
About
|
Sign Out
Home
1999_0419_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1999
>
1999_0419_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 12:52:20 PM
Creation date
9/29/2011 12:47:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
upgrade neighborhoods with a nix of compatible uses, and diversify and solidify the tax <br /> base. <br /> 3.3 The Cornerstone program, when utilized on this site would require (through its <br /> guidelines) neighborhood meetings, a planned unit development hearing, and the <br /> possibility of setbacks that are as close as 10 feet to the street property lines. Screening <br /> and the choice of materials for the construction are carefully guided. <br /> 3.4 The site will be subject to utility easements and storm water or ponding requirements <br /> because more impervious or paved surface is being created than has existed on the site. <br /> release of storm sewer easements will be required prior to the issuance of a building <br /> permit and review and approval by city engineering of site drainage will be required. <br /> 3.5 In conjunction with the application for concept development plan approval, the <br /> following documents have been submitted and reviewed by staff in preparation of this <br /> report: <br /> a. site plan including layout of off-street parking areas, location of building, <br /> and landscaping dated: 2/10/99 &revised 3/29/99 <br /> b* building elevation plans dated: 2/10/99 & revised 3/29/99 <br /> C. building floor plans dated: 2/10/99 <br /> d. colored rendering <br /> 3.6 A complete utility service, paving, grading, and drainage plan must be submitted to an <br /> approved by the City prior to consideration of the final development plan. provision of an <br /> casement for an additional 16.6 feet of right-of-way along Lexington Avenue are <br /> required. Completion of the sidewalk (Lexington) and landscaping details are also <br /> required. <br /> 3.7 Based on the proposed use of the building for limited office uses, the off-street parking <br /> spaces for employee and customer parking are sufficient. The site will have a joint <br /> parking casement with the property to the south. (Suburban Hardware) <br /> 3.8 The project, as proposed, is in harmony with the general purpose and intent of the City's <br /> Comprehensive plan and Title 10 of the City Code (Zoning). <br /> 3.9 The proposed project will not adversely affect the public health, safety, or general <br /> welfare. <br /> 3.10 The project will have minimal traffic impacts on the surrounding roadways. The Institute <br /> of Traffic Engineers (ITE) estimates that the national range for standard office/retail uses <br /> is from 250 to 400 trips per day, for a 10,000 s.f. building. However, this being a <br /> neighborhood commercial site it is anticipated that these particular officclretail uses will <br /> generate significantly fewer vehicle trips per day. Staff is working with the applicant on <br /> establishing local counts. Lexington currently has approximately 15,500 to 16,500 trip s <br /> per day in this area, while I oselawn has approximately 2,100 to 2,900 trips per day. <br /> PF3077-RPCA(04-14-99)-'Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.