Laserfiche WebLink
Park/Prince <br /> uentral Joint Use Parking Lot Scheme B <br /> Cost Estimates <br /> Demolition 109000 <br /> Earthwork 503000 <br /> Utilities 30X0 <br /> Parking Lot $ 150, 0 <br /> Lighting 15,000 <br /> Landscaping 36,000 <br /> Pathway (A) $ 112500 <br /> Pathway (B) $ 30,000 <br /> Sub-total $ 332,500 <br /> Contingency (20%) $ 661500 <br /> TOTAL ESTIMATE 399,000 <br />