Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br /> DATE: 02./22/99 <br /> V <br /> ITEM NO' G-1 <br /> Department Approval: Manager Approval: Agenda Section, <br /> REPORTS <br /> Description.* Lexington and B Land Use Proposed Changes (PF#3076) <br /> 1.0 REQUESTED ACTION <br /> 1.1 On October 12, 1998 the City Council approved a "Lex and B Charge" for both the Planning <br /> on mission and the Park and Recreation Commission. The Council requested them to study <br /> their respective parts of a scenario where land located at Lexington and B would be for <br /> neighborhood park (Park Commission) and "park complimentary" uses (Planning <br /> Commission). The Council charge to the Commissions gave some examples of uses that <br /> should be examined but were not meant to be limiting. On November 17,1998, the Planning <br /> Commission and the Park and Recreation Commission jointly met to discuss the issue., gather <br /> some input from the neighborhood, and decide on a course of study and reporting. The <br /> Planning Commission reviewed the background and provided a recommendation at their <br /> January 13, 1999 meeting. The Park Commission has held neighborhood meetings on the <br /> design of park improvements. <br /> 1.2 A second study, the developer feasibility, may be necessary to confirm and/or <br /> compliment the findings and land use recommendations of the Commissions to the <br /> Council for a final decision on the land uses by August/September, 1999. An 1 <br /> process could be used to select a developer. (Later in this report staff recommends a <br /> procedure.) <br /> 1.3 Park reconstruction could begin after the completion of the RFP and the selection of a <br /> developer(in conjunction with the developer's design and construction work). At a later date, <br /> hearings on an amendment to the City Comprehensive Plan, a Planned Unit development. <br /> and an addition to the City Five Year Capital Improvement Program would also be required. <br /> 1.4 A portion of the Council's decision may be to do the reconstruction of the site in phases, <br /> allowing the basic trees and turf landscaping and utility work to commence in 1999 but <br /> deferring action of costly fountains, walkways/sidewalks, and complimentary buildings until <br /> the City Center Task Force report and the Le x. and B developer feasibility study is complete. <br /> 4, <br /> 2.0 BACKGROUND <br /> 2.1 During August and September, 1998 the Council choice from a number of scenarios for <br /> redevelopment of the Lex and B site. After much discussion, a scenario with a neighborhood <br /> park and "park complimentary" use component was selected for further study. <br /> PF#3076 - RCA(02/22/99) - Page 1 of 3 <br />