Laserfiche WebLink
Muu--ul-duu1 12:18 INDUSTRIAL EQUIPMENT 407 W6 5990 P-06/12 <br /> Control Equipment <br /> r <br /> Combustion S passes through a wet scrubber prior to entering the chimney. Entrained <br /> particulate matter and other pollutants exiting the sccondary combustion chamber am removed in <br /> the scrubber. The horizontal, cylindric 6,stainless steel scrubber unit is oMa y 48 inches <br /> long with a 36-inch diameter and uses unmodified city WaW Ci.e., not a caustic or acidic <br /> solution). Water spray nozzles are located across the top of the cylinder, and "nS PVC <br /> water from the bottom of the cylinder. <br /> A temporary platform was erected which ran alongside the scrubber to allow for sampling at the <br /> scrubber inlet and outlet. The scrubber inlet was sampled in the 72-inch 10% hon ri raraular <br /> duct leading into the scrubber. The scrubber outlet was sampled in the 30-inch long horzontal <br /> circular duct connected directly to the scrubber This was temporary duct installed twreplace the <br /> original duct for the test. The number of traverse points sampling time at each point was <br /> identical for both inlet and outlet locations. <br /> Chimney <br /> I <br /> Ceift <br /> _I lOrw 3T I fr s" ' <br /> Hot r wet <br /> Scmbber U <br /> Charging <br /> �r <br /> tnletlOudet <br /> Sampling Lomflons <br /> ca <br /> E <br /> Prima Chamber f Secondary <br /> j '� wall <br /> � t <br /> Chamber <br /> Retort F <br /> Floor <br /> r-T <br /> Figure 2-1. Cremation Incinerator Unit <br /> 4 <br />