My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0824_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0824_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 3:08:50 PM
Creation date
10/5/2011 2:45:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 CONSTRUCTION DOCUMENTS [CHASE <br /> 2.4.1 Based oil the aPPrm-ed Design Development Documents and any. further adjU;t171-'ills HI <br /> the scope or uality of the Project car in tt�e construction hudoet authorized b% the �l�r, iF�c <br /> _ <br /> � <br /> re <br /> :architect shall Prepare, for apprL-wai b\, the Owner, C onstrLi tton Documents cr}11sktli1cy of <br /> Dray iirx�s and S -ecifications setting forth in detail the require}i eiitw for Lhe constructi011 cat the <br /> Project. <br /> 2.4.2 The Architect shall assist they CAN%-ner in the preparation of the necessary bid,11110 110 Z I <br /> information,biddino forms,the Co s of the ConLract,and L h e form o C At,�-et�11e�1t <br /> 0 <br /> the Owner and Contractor. <br /> .4.3 The :architect shall ad%-ise they 0%%-ner of an}- adjustments to PrCViOLLS prelim lidi"V <br /> estimates of Construction Cost indicated b%- changes in rzgluire ments or general s1tiarket <br /> conditions. <br /> x.4.4 The architect shall assist the y-ner in connection Nvith the Owner's respo sibiiiLv for <br /> ®no documents required for the approval of goverr mental authorities havintg Iurisdictioll ONVI, <br /> 0 <br /> the Project. <br /> 2.5 BIDDING OR NEGOTIATION PHASE <br /> The Architect, following the Owner's aPj-+rLwali of the Construction Documents and of the latest <br /> Preliminary estiniate of Construction Cost,shall assist the Owner in obtaining bids or llegotiatc,l <br /> proposals and assist in awarding and preparing,contracts for construction. <br /> 2.6 CONSTRUCTION PHASE-ADMINISTRATION OF THE CONSTRUCTION CONTRACT <br /> 2.6.1 The Architect's responsibility to provide Basic Services for the Construction Phase under <br /> th is Agreement commences with the award of the initial Contract for Construction and <br /> terminates at the earlier of the issuance to the Owner of the final Certificate for Payment or 6❑ <br /> days after the date of Substantial Completion of the Work. <br /> .2 The architect shall provide administration of the Contract for Construction as set fortl� <br /> �,� P <br /> below and irn the edition of AIA Document Ami, General Conditions of the Contract for <br /> Construction, current as of the date of this agreement, unless otherwise provided in this <br /> Agreement.Modifications made to the General Conditions,when adopted as part ofthe Contract <br /> Documents,shall be enforceable under this Agreement only to the extent that they are consistent <br /> with this Agreement or approved in writing by the architect. <br /> Duties responsibilities and limitations of authority of the architect under this Paragraph <br /> 2.6 shall not be restricted} modified or extended without written agre}ment of the Owner and <br /> Archi tect with consent of the Contractor, vhich consent will not be unreasonably. withheld. <br /> .6.4 The architect shall be a representAlve of and shall ad�-ise and consult %��itl-t the Owner <br /> during the administration of the Contract for Construction.The architect shall have authority to <br /> du g <br /> I �� act on behalf of the Owner only to the extent Provided in this agreement unless ather��ise <br /> modified by written amendment. <br /> The <br /> 2.6.5 rchttect,as a representative of the Owner}shall visit the site at intervals al�ProPriate <br /> � <br /> 01997 AIA0 toth <br /> e sta e of the Contractor's operations,or as otherwise agreed by the Owner and the architect <br /> i to become generally familiar Nvith and to keep the Owner informed about the <br /> AIA DOCUMENT 815 1��T lI7 Article 1�} � � g � endeavor to card the ��*"n�.r <br /> ABBREVIATED OWNER- ro Tess and dual itv of the Portion of the NV ark completed, (+} to g <br /> progress <br /> ARCHITECT AGREEMENT against defects and deficiencies in the Work,and (3) to determine in general if the Work is being <br /> d in a manner indicating that the Work, when fully completed, will be in accord a roc e(4 <br /> The American Institute �erfor'me g <br /> of Architects with the Contract Documents,However,the Architect shall not be required to make exhaustive or <br /> 1735 New York Avenue, N.W. <br /> Washington,D.C.20006-5292 <br /> WARNING:Unlicensed photocopying violates U.S.fopyri hr laws and will subject the violaror to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.