My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0824_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0824_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2011 3:08:50 PM
Creation date
10/5/2011 2:45:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determinations of soil bearing %-alues, percolation tests, evaluations; of hazardous materials, <br /> ground corrosion tests and r-esisti\•ity tests,including necessary operations for anticipating sLbsoll <br /> conditions,Nv-ith reports and appropriate recommendations. <br /> 4.6 The Owner shall furnish the services of consultants other than those designated in <br /> Paragraph 4.5 when such services are requested by the Architect and are reasonably required by the <br /> scope of the project, <br /> 4.7 The Owner shall furnish structural,nnechanical,and chenlica[tests;tests for air and \\•ater <br /> pollution;tests for hazardous materials;and other laboratory and environmental tests,inspectiol)S <br /> and reports required by law or the Contract Documents. <br /> 4.8 The Owner shall furnish al[legal,accounting and insurance services that may be neces arx- <br /> at any time for the Project to rneet the Owner's reeds and interests. Such services shall include <br /> auditing services the Owner may require to \,erif�,the Contractor's Applications for Payment or <br /> to ascertain how or for what purposes the Contractor has used the neon ey paid by or on behalf or <br /> the Owner. <br /> 4.9 The services,information,sun eys and reports required by Paragraphs 4.4 through 4.8 shall <br /> be furnished at the Owner's expense, and the Architect shall be entitled to rely upon the <br /> accuracy and completeness thereof. <br /> 4.10 The Owner shall provide prompt written notice to the Architect if the �v ne r bec ci m es <br /> aware of any fault or defect in the Project, including any errors, omissions or inconsistencies in <br /> r <br /> the Architect's Instruments of Service. <br /> ARTICLES CONSTRUCTION COST <br /> 5.1 DEFINITION <br /> 5.1.1 The Construction Cost shall be the total cast or, to the extent the Project is not <br /> completed,the estimated cost to the Qivner of all elements of the Project ject designed or sp ec i Fied by <br /> the Architect. <br /> 5.1.2 The Construction Cost shall include the cast at current market rates of labor and <br /> materials furnished by the Owner and equipment designed, specified, selected or specially <br /> provided for by the architect,including the costs of management or supervision of construction <br /> or installation prop#ided by a separate construction manager or contractor, plus a reasonable <br /> allowance for their overhead and profit. In addition, a reasonable allowance for contingencies <br /> shall be included For market conditions at the time of bidding and for changes in the Work. <br /> 5.1.3 Construction Cost does not include the compensation of the Architect and the Architect's <br /> consultants,the costs of the land}rights-of-way and financing or other costs that are the respon- <br /> sibility of the owner as provided in Article 4. <br /> 5,2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> #, 5,2.1 Evaluations of the owner's'project budget,the preliminary estimate of Construction Cost <br /> and detailed estimates of Construction Cost, if any, prepared by the Architect, represent the <br /> Architect's judgment as a design professional familiar with the construction industry. It is <br /> Q 19 9 7 A I A 0 recognized,however,that neither the Architect nor the Owner has control over the cost of 1 abor, <br /> All pOCUME1~IT B151-1997 <br /> materials or equipment, over the Contractor's methods of determining bid prices, or over <br /> ABBREVIATED OWNER- <br /> competitive etitive bidding, market or negotiating conditions. Accordingly, the Architect cannot and <br /> ARCHITECT AGREEMENT p <br /> does not warrant or represent that bids or negotiated prices will not Vary from the Owner's project <br /> The Arnerican Institute budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the <br /> of Architects <br /> 1735 New York Avenue, N.W. <br /> Architect. <br /> Washington,D.C. 20006-5292 <br /> WARNING:Unlicensed photocopying violates U.S,copyright laws and will subject the violator to legal prosecution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.