Laserfiche WebLink
minimum use of the System. If service is interrupted for a total period of more <br /> than forty eight (48) hours in any thirty (30) day period, Subscribers s ha it be <br /> credited pro rata for such interruption. <br /> 4 Technical S andards. The technical standards used in the operation of the System <br /> shall comply, at minimum, with the technical standards promulgated by the FCC <br /> relating to Cable Systems pursuant to Title 47, Section 76.601 to 76.617, as may <br /> be amended or modified from time to tine, which regulations are expressly <br /> incorporated herein by reference. <br /> 5. Special Testing. <br /> a. The City shall have the right to inspect all construction or installation work <br /> performed pursuant to the provisions of the Franchise. In addition, the <br /> City may require special testing of a location or locations within the System <br /> if there is a particular -natter of controversy or unresolved complaints <br /> regarding such construction or installation work or pertaining to such <br /> locations). Demand for such special tests may be made on the basis of <br /> complaints received or other evidence indicating an unresolved controversy <br /> or noncompliance. Such tests shall be limited to the particular matter in <br /> controversy or unresolved complaints. The City shall endeavor to so <br /> arrange its request for such special testing so as to min nxize hardship or <br /> inconvenience to Grantee or to the Subscribers caused by such testing. <br /> . Before ordering such tests, Grantee shall be afforded thirty (30) days <br /> following receipt of written notice to investigate and, if necessary, correct <br /> problems or complaints upon which tests were ordered. The City shall <br /> meet with Grantee prior to requiring special tests to discuss the need for <br /> such and, if possible, visually inspect those location which are the focus <br /> of concern. If, after such meetings and inspections, City wishes to <br /> cormence special tests and the thirty (3 0) days have elapsed without <br /> correction of the nutter m controversy or unresolved complaints, the tests <br /> shall be conducted at Grantee's expense by a qualified engineer selected by <br /> City and Grantee, and Grantee shall cooperate in such testing. <br /> 6. 12rop esting_and R <br /> &placement. Grantee shall insert a 750 MHz carrier at a level <br /> 10db below the video carriers that will be measured by Grantee as a normal <br /> procedure during all service calls. In addition, the Drops and related passive <br /> equipment will be inspected during Installations to assure that the Drop and passive <br /> equipment can pass the full 750 MHz System capacity. In the event measurement <br /> of the carrier or the inspection demonstrate that a Drop or associated passive <br /> equipment do not pass the full 750 MHz, the Subscriber address will be recorded <br /> by Grantee and Grantee shall provide City} or its designee, upon request a report <br /> indicating the addresses where Drops or associated passive equipment have failed. <br /> Grantee shall replace all failing Drops and/or associated passive equipment at the <br /> 1 <br />