IN <br /> contain the information determined by the Director to be necessary to facilitate the coordination <br /> and reduction in the frequency of excavations and obstructions of rights-of-way, <br /> The P lan shall include, but not be limited to, the following information: <br /> (a) The Iocations and the estimated beginning and ending dates of all Projects to be <br /> commenced during the next calendar year (in this section} a "Next-year Project"); and <br /> (b) The tentative locations and estimated beginning and ending dates for all Projects <br /> contemplated for the five years following the next calendar year (in this section, a "Five- <br /> year project" . <br /> The term "p rojecti' m this section shall include both Next-year Projects and Five-year Projects. <br /> By January 1 of each year the Director will have available for inspection in this Director's office <br /> a composite list of all Projects of which the Director has been informed in the annual plans. All <br /> registrants are responsible for keeping themselves informed of the current status of this list. <br /> Thereafter, by February 1, each registrant may change any Project in its list of Next-year <br /> Projects, and must notify the Director and all other registrants of all such changes in said list. <br /> Notwithstanding the foregoing, a registrant may at any time join in a Next-year Project of <br /> another registrant listed by the other registrant. <br /> , Additional Next-year Projects. Notwithstanding the foregoing, the Director will not <br /> den y an application for a right-of-gray permit for failure to include a project in a plan submitted <br /> Pp <br /> to the City if the registrant has used cormnercially reasonable efforts to anticipate and play for <br /> the project. <br /> Sec* 707.08* Permit Requirements <br /> ubd. t. Permit Required. Except as otherwise provided in this Code, no person may <br /> obstruct or excavate any right-of-way without first having obtained the appropriate right-of-way <br /> permit from the Director to do so. <br /> (a) Excavation Permit. An excavation permit is required by a registrant to excavate <br /> that p art of the right-of-way described in such permit and to hinder free and open passage <br /> over the specified portion of the right-of-gray by placing facilities described therein, to <br /> the extent and for the duration specified therein. <br /> (b) obstruction permit. An obstruction permit is required by a registrant to hinder free <br /> and open passage over the specified portion of right-of-way by placing equipment <br /> described therein on the right-of-way, to the extent and for the duration specified therein. <br /> An obstruction p ermit is not required if a person already possesses a valid excavation <br /> permit for the same project. <br /> g <br />