My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0727packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0727packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2011 11:45:19 AM
Creation date
10/6/2011 11:27:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd. 2, Additional Equipment. When an excavation permit is requested for purposes of <br /> installing additional equipment, and the performance and restoration bond presently existing is <br /> insufficient with respect to the additional equipment, in the sole discretion of the Director, the <br /> posting of an additional performance and restoration bond for the additional equipment may be <br /> required in accordance with Section 707.05, subd. 1. <br /> Sec. 707.10. Issuance of permit* conditions. <br /> Subd. 1. Permit Issuance. If the applicant has satisfied the requirements of this Chapter, the <br /> Director shall issue a permit. <br /> Subd, 2. Conditions, The Director may impose reasonable conditions upon the issuance of the <br /> permit and the performance of the applicant thereunder to protect the public health, safety and <br /> welfare or when necessary to protect the right-of-way and its current use. <br /> Sec. 707,11 t Permit FM. <br /> Subd. 1. Excavation Permit Fee. The Excavation Permit Fee shall be established by the City <br /> Council in an amount sufficient to recover the following costs: <br /> (a) the City cost; <br /> (b) degradation cost, if applicable. <br /> Subd. 2. obstruction Permit Fee. The Obstruction permit Fee shall be established by the <br /> City Council and shall be in an amount sufficient to recover the City cost. <br /> Subd. 3. Payment of Permit Fees. No excavation permit or obstruction permit shall be issued <br /> without payment of excavation or obstruction fees. The City may allow the applicant to pay <br /> such fees wiin thirty 30) days of billing. <br /> Subd. 4. Non refundable. Permit fees that were paid for a permit that the Director has <br /> revoked for a breach as stated in Section 707.21 are not refundable. <br /> Sec. 707.12. Right-of-Way Repair and Restoration. <br /> Subd. 1. Timing. The work to be done under the excavation permit, and the patching and <br /> restoration of the right-of-way as required herein, must be completed within the dates specified <br /> in the P ermit, increased by as many days as work could net be done because of extraordinary <br /> circumstances beyond the control of the permittee, as detern fined by the Director, or when work <br /> was prohibited as unseasonal or unreasonable under Section 707.15. <br /> Subd. 2. Patch and Restoration. Permittee shall patch its own work. The City may chose <br /> either to have the permittee restore the right-of-way or to restore the right-of-way itself. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.