My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0727packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0727packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2011 11:45:19 AM
Creation date
10/6/2011 11:27:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the dispute is not resolved within 30 days of the written notice, the parties may jointly select <br /> a mediator to facilitate <br /> further discussion. The parties will equally share the fees and expenses <br /> • mediator is not used or if the parties are unable to resolve the dispute <br /> of this mediator. if a rrx <br /> s after first meeting with the selected mediator., either party may commence an <br /> within � }� � � _ � ��, � � '� or for such other- <br /> . e Coup District Court to interpret and Anf rce thhis franchise <br /> action in dams . <br /> ` ed b law or equity for breach of contract, or either' party may tale any <br /> relief�� may �� permitted � � <br /> other action permitted by law. <br /> SECTION 1 Lo ATIO OTHER REGULATIONS, <br /> 3.1 location of Facilities. Electric Facilities shall be located, constructed and <br /> maintained so as not <br /> to interfere with the safety and convenience of ordinary travel along and <br /> over Public Ways and so as not to disrupt normal operation of any City Utility System <br /> previously installed herein. Electric Facilities shall be located on Public Grounds as determined <br /> by the pity. Company's construction, reconstruction, operation, repair, maintenance and <br /> location of Electric Facilities shall be subject to other reasonable regulations of the City to the <br /> � <br /> extent not inconsistent with the teams of this franchise agreement. <br /> Locations. Company shall provide field locations for its underground <br /> . Field P y <br /> Electric Facili ties <br /> ` within City consistent with the requirements of Minnesota Statutes, Chapter <br /> 16D. <br /> enm' s. Company shall not open or disturb any Public way or Public <br /> 3.3 trees _ � p y <br /> ground for any purpose without first having obtained a permit from the City, if required by a <br /> ` which the i may impose a reasonable fee. Permit conditions imposed <br /> separate ordinance, for y p <br /> on Company shall not be more burdensome than those imposed on other utilities for similar <br /> . . . an ma however, open and disturb any Public Way or Public Ground <br /> facilities or work. Company �'� p <br /> • the i where an emergency exists requiring the immediate repair of <br /> without permission from <br /> Electric Facilities. In Company such event Coin an shall notify the City by telephone to the office <br /> designated by the City as soon as practicable. Not later than the second working day thereafter, <br /> Y Company <br /> shall obtain an required permits and pay any required fees. <br /> � <br /> g <br /> Restoration..� <br /> After undertaken any work requiring the opening of any Public Way <br /> • shall restore the Barrie, including paving its foundation, to as gaud <br /> or Public ground, company . . <br /> existed, and shall maintain any paged surface in good condition for two <br /> a condition as formerly e � , <br /> work shall be completed as promptly as weather permits, and if Company <br /> years thereafter' 'I�'lie wo F � and <br /> perform and complete the work, remove all dirt, rubbish, equipment a <br /> shall not promptly p p shall gave <br /> Public a or Public Ground in the said condition, the City , <br /> rnat►�ria1, and put the �' � e <br /> to cure and the passage of a reasonable period of time following <br /> after demand to Company • of <br /> exceed five days, the right to make the restoration at the expense demand, but not to y b e <br /> 11 a to the i the cost of such work done for or performed <br /> Company. Company shall p <br /> City. This remedy shall be in addition to any other remedy available to the City for <br /> noncompliance with this s Section 3.4, but the City Hereby waives any requirement for Company <br /> to post a construction performance bond, certificate of insurance, letter of credit or any other <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.