My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0622_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0622_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2011 2:15:01 PM
Creation date
10/6/2011 1:54:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT- EXCERPT <br /> CITY of ROSEVILLE <br /> PLANNING COMMISSION MINUTES <br /> Wednesday, June 10, 1998 <br /> 1. CALL TO o <br /> Chair Katie Harms called the regular meeting of the Roseville Planning <br /> Commission to order at 6:30 p.m. in the City of Roseville City Council Chambers. <br /> 2. ROLL CALL AND INTRODUCTIONS: <br /> Present" John Rhody, Doug Wilke, Katie Harms, Janet Olson <br /> Absent.. <br /> Edgard Cunningham, Craig Klausing, dames Mulder <br /> • <br /> Staff Present: Kim Lee, Jay Kennedy, Pat Morrison <br /> Council Present: Barb Mastel <br /> 6, PIJBLIC <br /> 027: National Tire and Battery request far Conditional Use <br /> a. �iarM�in� File <br /> Permit to construct 10,790 square foot auto accessory installation any! <br /> � � <br /> service stare at 2561 North Snelling Avenues <br /> Chair Harms opened the hearing and requested dim Lee to present a summary <br /> report of the staff art dated ,dune 10, 1998. The request before the Planning <br /> Commission is to construct a 10,790 s.f. masonry and stucco building on a <br /> ornr�iss�o <br /> vacant 1. acre site located at 2561 North Snelling Avenue. The building would <br /> be occupied by National Tire Warehouse, a tire and auto accessory sales and <br /> serve• business (retail auto accessory and auto service). i i m Lee discussed <br /> bus <br /> I Use Permit process, considerations the Planning Commission <br /> the orrd�t�or�a � R <br /> reviewing the request and the history of this site, including <br /> should consider in r � � <br /> the moratorium and Jaynes Addition Task Force efforts. She advised the area <br /> was toned B-2, <br /> Limited Business district in the Comprehensive Plan. <br /> • air Ms Lee compared the current plan with the NTE plan <br /> l� reviewing the site �l � <br /> • indicating n the size of the building had been somewhat <br /> submitted 1� �� � <br /> reduced and additional landscaping provided. The site is 1.85 acres in size with <br /> s and southerly egress; parking will take up 4 of the site <br /> an easterly ingress � <br /> e uirements; applicant has agreed to cross parking with <br /> and will exceed code r q � �� <br /> Knights of Columbus site and access easement between the two properties; a <br /> surface water storms story pond is located along the rear (westerly) property <br /> �a <br /> line (discussion took place later as to the feasibility and practicality of fencing in <br /> nt to the public ark); landscaping plan was Illustrated, <br /> the fond as it 'is adjacent � 1� <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.