Laserfiche WebLink
Roseville Skating Center <br /> Fie-Bid Resufts <br /> Low Bid Low Fie-Bid Result <br /> Section Description 5/19198 6 /98 <br /> E Landsca 16,1 00.00 110705-00 $ (4,395.00) <br /> 7 Roofing 111,x`50.00 $101,348-00 (10,40 .00 <br /> a Hollow Metal Frames 610247.00 55,983.00 5 <br /> Aluminum 1 Glazing 51,500.00 $ 35,700.00 1 5,600.0] <br /> Overhead Boors $ 11, 63.00 $ 61330.00 (41933.00 <br /> 9 Flooring S 69'714.00 879776.00 1,639.00) <br /> Painting 69-0496.00 470765.00 (?l 0730.00) <br /> 16 Ele cal $ 1723277.DO $1 57,178.00 $ 163- 9.00 <br /> Sub Total: $(79,562.00) <br /> PR#1 Results Change in Contract <br /> Amount <br /> E 2 Sitework 1 Demolition N/ <br /> Utilities 496.00 <br /> Selective Demolition 1,366.00 <br /> Bituminous Paving x,000.00 <br /> hEMOM 3 C.I.P. Concrete 11794.00 <br /> Prey Eonctete N/C MEMEMd <br /> 4 !Masonry $ 596.00 <br /> S Steel O) $ 990.00 <br /> Structural l Seel (1�0) $ 21573.00 <br /> Misc. Metals $ (10000.00) <br /> 6 Carpen# M0) 499.00 <br /> Carpent O L987.00) <br /> Architectural Woodwork NIC <br /> 7 CaT5WK Sealants $ <br /> urn Mems $ 216.00 <br /> Ceramic Tile (M2) (11500.00) <br /> Ceramic Tile O 1460.0 <br /> Acoustical Ceiling O 1100.00 <br /> Acoustical Ceilino 1940.00} <br /> 10 !fetal Toilet Partitions N/C <br /> Signs N1 <br /> Fire Ftinguishers <br /> Toilet&Bath Accessories N/C <br /> Ll Projection Scmen N/C <br /> Elevator 475. <br /> Plumbing <br /> $ (125.00 <br /> 1 .V.A,C. 7,761.00 <br /> -� <br /> Sound System N/ <br /> Sub Total: $ 698,00 <br /> Net Total Savings: (780864.00) <br />