My WebLink
|
Help
|
About
|
Sign Out
Home
2002_0325_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_0325_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2011 10:20:05 AM
Creation date
10/7/2011 10:05:58 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Parking: F <br /> Each development should minimize surface parking to reduce lot coverage when <br /> possible. Underground or in building parking is encouraged especially for those multiple <br /> residential developments that are more than 10 units per acre. Alleys and on street <br /> parking can be considered for small lot single family and townhome developments based <br /> upon how the objectives for the Plan are met and how the proposal reduces lot coverage. <br /> Shared parking should be encouraged on all sites when feasible. <br /> 4. Public Open Space/Trails: <br /> Each phase of development should incorporate public open spaces and connectivity to <br /> existing and new neighborhood and trail systems, Public access should be provided to <br /> and from all open space areas. Appropriate landscaping and street trees will be provided <br /> in all public roadway areas and trails consistent with the City of Roseville Street Tree <br /> Master Plan. <br /> 5. Quality Design Standards: <br /> It is critical that the first phase of development set the standard for quality and innovative <br /> design that will be carried out throughout the entire Aronafflamline Neighborhood. The <br /> designs are to be residential and human scale with the mass and height of buildings to <br /> match the context of the existing construction where possible. <br /> 6. Stormwater: <br /> Existing water capacity should be expanded and improved in all ponding areas. The <br /> existing pond will be improved for water quality, storage and esthetics. A walking path <br /> around these ponds should be an integral part of the reconstruction. Each development <br /> will require some types of water retention system. Innovative or-site management of <br /> storm water through roof gardens, storage in and under parking lots and provide or-site <br /> ponding that is an amenity to the development will be encouraged. <br /> 7. Traff clAccess: <br /> Additional access to the Arona site from Hamline is critical to the development and may <br /> require the purchase of additional public right of way along Terrace. Emergency access <br /> should be maintained and improved from the Arona site south to Snelling Frontage Road. <br /> The redevelopment plan will generate between 1,000 to 2,000 additional trips per day, <br /> which will be distributed among four exit areas (Arona Street, Terrace Drive -new <br /> connection, Centennial, and new east-west street entrance in Phase II— shopping center <br /> area). However, there will be no further programmed recreation field games at the Arona <br /> site. Office users, if proposed on Phase I, could exit through the JLTINCR site. Senior <br /> facilities tend to have 40 to 60% less traffic than other types of housing. The <br /> neighborhood existing vehicle trips are estimated at approximately 800 to 1000 trips per <br /> Y <br /> Arona-Hamline Neighborhood Master Plan - 2002 Page 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.