Laserfiche WebLink
. � n ��d new legal descriptions for the <br /> miner subdivisions recombination, • <br /> proposed � conjunction with the request. The <br /> parcels have been submitted in nonju <br /> three resulting � � th and lit area for the <br /> • � <br /> three resulting parcels w ill meet the minimum width, � <br /> zoning district and <br /> PU D in which they are located. <br /> 2.3 The requested minor subdivision has been reviewed by Engineering eering staff. <br /> . Since the <br /> existing � � are not changing, there will be no additional imp arts on utilities, traffic <br /> . . � v�rNll be <br /> right-of-way or utility easement dedication <br /> and/or access. No a������rral r��ht ]� <br /> arx <br /> required with this action. However, staff will work with Ryan om pa n yes to resolve <br /> drainage easements and <br /> � <br /> any vacation and relocation of utility, pathway, and <br /> � <br /> proposed expanded storm pond easements. <br /> 2.4 Section 1104.0413 of the City Code outlines the procedure for a recombination type <br /> 4 outlines the procedure for a <br /> bd ivision and Section 1104. <br /> �f miner subdivision <br /> consolidation typ e of minor subdivision.on. Neither type a cf minor subdivision requires <br /> - The recombination of the <br /> ' �r review by the Plan <br /> �nnmissicn <br /> a public hearing d action is approved, the final <br /> Council approval. If the requests <br /> parcels requires p �sni Development <br /> R will be reviewed b the Community P <br /> certificate of survey far all actions <br /> 'recur and then recorded with the Ramsey aunty Recorder by the applicant. <br /> SUGGESTED A nO <br /> • 1 for a nnir�cr subdivision to allow the <br /> rove an Companies' request <br /> �� �� m�t��r�, app ]� � Easiness Park into parcels <br /> • Lots 5 of Block �1, Centre Point <br /> recombination �f L � cri ticns dated April �, <br /> ed on the drawings an p <br /> as described and illustrated d legal des A <br /> 1998 or as corrected, subject to review by the C <br /> ity Attorney, Engineer, <br /> an <br /> d subject <br /> to vacation and relocation of city uti. t Pathway, d rainage, and pcnd i ng e asements <br /> • � inn of the storm water easement. <br /> v��#h�r� Lets , �, �, and spans <br /> • proposed subdirii�nf property; and teal <br /> Attachments: <br /> Q ration map; survey of property; R P� <br /> descriptions of existing and proposed parcels.ei�. <br /> . 19 98' decision deadline is June 20, 1998. <br /> Limit Application submitted on April 20, <br /> 60-day Time � <br /> Prepared by: Dennis Welsch(490-2232) <br /> p <br /> M:1R AXPF301 .R A <br /> PF#301 3-INCA(04/27198)-page 2 of 2 <br />