Laserfiche WebLink
Page 2 <br /> 1997 Contract B <br /> 4/27/98 <br /> Policy objectives: City policy requires that the following items be completed to finalize a <br /> construction contract: <br /> A project summary sheet detailing costs and schedule. <br /> Certification from the City Engineer verifying that all of the work has been completed in <br /> accordance with plans and specifications. <br /> • A resolution by the City Council accepting the contract and beginning the one-year <br /> warranty. <br /> Financial implications: The work performed on this contract was part of the 1 997 Pavement <br /> r � t + . <br /> Management Program. The cost of this contract will be financed as outlined in the feasibility <br /> g � <br /> report approved by the City Council on January 27, 1997. <br /> There were 2 change orders to this project totaling $16,073.2 1. The change orders covered costs <br /> associated with additional storm sewer work and the removal of the Central Park arboretum <br /> portion of the project. <br /> The final contract amount, 1,067,043.76 is $1 64,052.78 greater than the awarded amount of <br /> $902,990.98. This represents an overrun of approximately 18%. Of the 1 64,052.78, $58,000 is <br /> due to private work that is funded directly by property owners and $42,000 is due to additional <br /> work on the Terrace Drive mill and overlay project between County Road C and Dale Street. The <br /> additional work on Terrace Drive involved removal of the cul-de-sac near County Road C and <br /> complete removal of the'roadway surface instead of milling. This will result in a better roadway in <br /> the long nun. <br /> Construction of the berms along Highway 36 resulted in an excess cast of$45,000. Staffs intent <br /> y <br /> was to construct the beans at i cost. This was based on the fact that the berm site offered <br /> e contractor a location to lace excess material. The cast in this case would have been included <br /> the � <br /> as art of the project casts. In reviewing the contractoes bids, there was very little cast savings. <br /> p p � <br /> This ear, � pp staff has changed the approach to constructing the beans which will greatly reduce or <br /> r . <br /> eliminate the costs. For 1 997 Contract E, it is proposed to fund the cast of budding the berms <br /> with the contingency fund. <br /> Current i requires that cost overruns m excess of 5%of the original contract amount be <br /> burr policy �l <br /> approved the Council. Not including the amount financed directly by propel owners, the <br /> pp g <br /> overruns total approximately $106,000 (12%). <br /> Of the final contract amount, $77,402.75 is paid directly by property owners for private driveways <br /> and sanitary sewer service repairs, 50,7 4.3 is appropriated to sewer and water funds for sewer <br /> and watermain re p airs, and 3 5,494. is appropriated to storm utility for installation and repairs. <br />