My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0310_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0310_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2011 1:45:37 PM
Creation date
10/10/2011 1:23:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ryan Companies US, Inc. <br /> 0 Y�AH <br /> it I! '['!-, 1,1',1'a_ l <br /> January 7, 1998 <br /> Ir. Doug Strong <br /> City of Roseville <br /> 2660 Civic Center Drive <br /> Roseville, MN 55113 <br /> RE: Part of Lot I and Lot 2, Block 3, Centre Pointe Business Park <br /> (Centre Pointe Phase - utility . Drainage Easement <br /> Dear Doug: <br /> This letter is written concerning our phone conversation of a couple of weeps ago <br /> concerning Ryan's need for another Utility & Drainage Easement for sanitary sewer <br /> purposes across the above referenced property and to provide an explanation for our <br /> request. <br /> Decently we financed the above referenced property and were required to have are As <br /> Built Survey prepared. During the process of preparing the Survey, Scott Gyllen with <br /> Westwood Professional Services (Westwood) alerted us that a portion of the sanitary <br /> sewer line for the project was constructed outside the existing easerent area created by <br /> that certain Drainage and Utility Easement, Document No. 3024117. As you may recall <br /> that Easement was granted to the City simultaneous with the City's approval of the <br /> vacation of a platted easement and consolidation of Part of Lot 1 and Lot 2. <br /> It appears our original acquisition survey prepared by unde Land Surveying dated April <br /> 8, 1997 located the sanitary sewer manhole approximately 126 feet from the west <br /> property line of Lot 2 when, to'fact, the Westwood survey locates it approximately I 1 <br /> feet from the west line. This difference resulted in the line being constructed about 2 feet <br /> west of and outside the existing easement area at the more southerly point. <br /> To assist in your understanding of our concerns and needs regarding this matter, I enclose <br /> the following documents: <br /> 1. Utility and Drainage Easement, Doc. No. 3024117. <br /> 2. As Built Survey prepared by Westwood, last revision date 12/5/97 <br /> showing the area of concern color coded. <br /> .J Ieglmemn Jlr598ti9$0107 doe <br /> ICI <br />
The URL can be used to link to this page
Your browser does not support the video tag.