Laserfiche WebLink
(a) City restoration. If the City restores right-of-N��a�, pennittee shall Fad' the costs <br /> thereof within thirty (30) days of billing. If., during the thirty-sic (36) months following <br /> such restoration, the pavement settles due to pe rmittee's improper bac kfi l i i n g, the <br /> F <br /> ermittee shall pay to the City, within thirty ( 0) days of billing, all costs associated with <br /> having to correct the defective work. <br /> (b) e Restoration. If the pennittee restores the right-of-way itself, 1.IU�.� shall ai <br /> the tirne of application for an excavation permit, if the Director determines additional <br /> security s necessary, post an additional performance and restoration bond in an amount <br /> tY <br /> determined by the Director to be sufficient to cover the cost of restoration. If, thirty-six <br /> (36) months after completion of the restoration of the right-of-way, the Director <br /> determines that the right-of-way has been properly restored, the surety on the <br /> Performance and Restoration Bond posted pursuant to this subd. 2(b) shall be released. <br /> uhd, 3. Standardso The permittee shall perform patching and restoration according to the <br /> standards and with the materials specified by the Director. The Director shall have the authority' <br /> to P rescribe the manner and extent of the restoration, and may do so in written procedures of <br /> general application or on a case-by-case basis. The Director in exercising this authority shall <br /> be guided by the following considerations: <br /> (a) The number, size, depth and duration of the excavations, disruptions or damage to <br /> the right-of-way; <br /> (b) The traffic volume carried by the right-of-way; the character of the neighborhood <br /> surrounding the right-of-way-, <br /> The re-excavation condition of the right-of-way; the remaining life-expectancy f <br /> (c) p <br /> the right-of-way affected by the excavation; <br /> (d) Whether the relative cost of the method of restoration to the perrnittee is in <br /> reasonable balance with the prevention of an accelerated depreciation of the right-of-way <br /> that would otherwise result from the excavation, disturbance or damage to the right-of- <br /> way- and <br /> (e) The likelihood that the particular method of restoration would be effective in slowing <br /> the depreciation of the right-of-way that would otherwise take place. <br /> Guarantees. By choosing to restore the right-of-gray itself, the perrnittee guarantees <br /> its work <br /> and shall maintain if for thirty-six (36) months following its completion. During this <br /> 36-month period it shall, upon notification from the Director, correct all restoration work to the <br /> extent=rno F p � <br /> necessary, using the method required by the Director. Said work shall be comple ted <br /> within five (5) calendar da s of the receipt of the notice from the Director, riot including days <br /> y • <br /> during <br /> which work cannot be done because of circumstances constituting force rnaaeure or days <br /> when work is p rohibited as unseasonal or unreasonable under Section 707.15 <br />