My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0310_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0310_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2011 1:45:37 PM
Creation date
10/10/2011 1:23:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stores used to construct the wall. This modification results `in an additional $71.47-5 to be <br /> added to the contract. For the two areas where the wall was constructed to -1 height of <br /> feet a much more involved design was required to accommodate the fact that the stones <br /> themselves would not be sufficient to hold back the soil. In this case the soil behind the <br /> walls was reinforced and the stones were placed adjacent to the reinforced soil. The cost <br /> to build the walls in these two locations is $99,68 5. <br /> Since the total of Change Orders No. f and Igo. exceeds 5% of the original contract of <br /> $210241,414, the City Council is required by policy to approve Change Order No. 2. <br /> • ns: The cost for Change Order o. 2 is $171,160,00, The total additional <br /> Financial impiicat e <br /> cost including Change Order No. I is $245,660, which is approximately 12% over the original <br /> contract amount. The casts for Change orders Igo. l and 2 Will be financed by the City's Utility <br /> Funds and Mum*cipal State Aid account. <br /> RECOMMENDED COUNCIL ACTIONG <br /> Motion approving Change Order No. 2 for 1997 Contract A. <br /> Prepared by: Jay leaned <br />
The URL can be used to link to this page
Your browser does not support the video tag.