Laserfiche WebLink
1 I <br /> w. r i �' � -- y1? Feb 10 9 16 : 21 No - 003 W.0 r <br /> Project Description <br /> I Batching <br /> Ramsey Courtier InteriM Use PerM"t Concrete Crushingt <br /> Ramsey mse� County's Public Works Department is requesting an interim use permit to allow concrete <br /> i operations on a portion of a O acre County-owned percel located east of Dent <br /> crushing and batch mixing o p � � MOO materlais from <br /> Street and north of La entuer Avenue. Ttlese operations will alloy th a County t � <br /> tree � � � I t is anticipated ated that recycling the <br /> existing La entuer Avenue in the reconstruction of this roadway. p • <br /> th 9 � ers approximately Neither concrete <br /> concrete rnaten als will save Ramsey County and its to pay pP � <br /> crushing or concrete batch mixing <br /> activities would be allowed to occur at the same time as tree and stump <br /> grinding activities. <br /> • soda an interim use permit is not required to be consistent with <br /> According to section �t?1 .��of the � , et all of the�or��n <br /> e designation nation identified in the Comprehensive Plan, nor is it required to meet .g <br /> the land us +� <br /> district in which it is located. A request for an Interim use permit is <br /> standards established for the � . � reviewing are nest for an <br /> processed <br /> in the same manner as a request for a conditional use permit. In re e � q . <br /> attach con itlons and will establish a specific date or event that will <br /> interim use permit, the r may � ot�r�eil must a�sc determine <br /> the use on the property. In granting an interim use permit,the "Ity <br /> terminate � � - . - It in adversa impact on the public health and <br /> that the approval of the interim use permit. 1) will net result � . p <br /> f to the public, and 3) there am no additional costs added to the site that <br /> welfare, ��the operation is sae p <br /> would deter a permanent use at a later time. <br /> too operate the portable concrete crusher on the site from April <br /> Ramsey bounty Public Works proposes p . ��l of the concrete <br /> 't during 1998 and 1 g , and dunng the construction season in 2000 <br /> 1 through May � ' n project oral �rit�r no other projects <br /> to be crushed will come from the Larpente ur Avenue reconstructio p J y <br /> „ • -bacW' on this activity. The concrete to be crushed would be stockpiled between <br /> being allowed to pi��y � i for new roadway <br /> . . with meshed concrete being stockpiled for reuse in the concrete mixed Y <br /> crushing visits, t � r will be crushed each <br /> r• for Lar enteur Avenue. Approximates 20,000 metric torts of concrete <br /> material p. - . concrete crushing would only be allowed <br /> sear1,11t�'1Ippfoll7litel � being crushed per day. , <br /> throe h�nda 1II�Ith hours of opemtlor�s Iirrrrted to 8.00 am to 500 <br /> durin the normal work r�ree (Monday � Y�� swill riot exceed 16 days per year. Water will be used to control <br /> p.m. The total number of crushing day <br /> dust during crushing operations. <br /> allowed on two separate occasions per construction season, for a period <br /> Concrete batch mixing would a p . , d pouring <br /> days per occasion. Batch mixing generally requires long hours of mixing an p g <br /> up to fie working p <br /> during these periods. Although specific times have not been established@ it is possible that the site mould <br /> operate from sunrise to sunset_ During this time, true would ld be entering and/or leaving the site ever] <br /> 2-3 minutes, and equipment would be used to load materials into the mixer and remove the final product <br /> resulting in back-up warning system noise. <br /> I in decibels (dB) range from 57.6dB to 64.6dB for the concrete recycling <br /> The projected sound lave s . <br /> • • n purposes, the measured sound levels for the tub grinder(taken during the <br /> activities. for corrrparrso p rp , <br /> from 60,1 dB to 7 .4dB:and the measurred we background sound <br /> demonstration on 1�1����� range daytime residential <br /> levels (taken on 1/30198 and 2/4198) range from 4.7dB to 68.4d B. The M P A y. <br /> gels for other uses include dB to 65d13 for background interstate traffic <br /> standard is ����, Sound le jet .Horse' 1 O5dB to 11 Od B far a roc# concert,-a nd 110d B to 120dB for a ai rpia ne. <br /> that it would notify effected residents In writing at least five days prior to the <br /> The County has indicated . <br /> concrete crushing or concrete batching activities, The original list of residents to be <br /> commencement of co �notified would be provided the Community Development Director, with the understanding <br /> that other <br /> residents could be placed on the notification list by contacting the County, <br /> • reviewed annual! <br /> If granted, the interim use permit would bar , including a review of south level� <br /> measurements and <br /> dust court levels- The interim use permit would expire December 31 P 2000. The <br /> ' could be revoked prior to this date for non-compliance with the specified conditions. <br /> interim use permit P <br />