Laserfiche WebLink
Storm Water Drainage Oyerating Bud : The City provides for the management of storm water <br /> drainage to prevent flooding and pollution control, as well as street sweeping and the leaf pickup <br /> program. The storm sewer operating costs are expected to increase substantially in 2003. The <br /> majority of the increase is for capital improvements to the system which will include <br /> replacement of storm water mains along County Road C, and Stormwater Phase II <br /> improvements. Given the size and cost of these projects, it is suggested that an increase in rates <br /> and existing reserves be used to finance the projects. Nearly $1 million in existing cash reserves <br /> will be used to fund these projects. This will leave the fund with a reserve of approximately $1.5 <br /> million. It's worth noting that the Stormwater Management Plan currently underway is expected <br /> to identify additional capital improvement projects that will necessitate the use of reserves as <br /> well. <br /> Recycling Budget: The recycling operation provides for the contracted curbside recycling <br /> pickup throughout the City. The primary operating cost is the amounts paid for a contractor to <br /> pickup recycling materials. Earlier this year, a Recycling Task Force recommended that the City <br /> provide curbside recycling service to multi-family housing. This will necessitate an increase in <br /> the rates. <br /> Recommendation <br /> After reviewing the needs of the various enterprise-type operations and the current rate structure, <br /> Staff feels a rate adjustment is warranted. This is based on the following: <br /> ❑ The City will realize a 2-5% increase from various service providers including the City of <br /> St. Paul, MCES, and Waste Management. <br /> ❑ The City is projecting a 3% increase in City-controlled operating costs. <br /> ❑ Substantial capital replacement costs will be incurred in the next several years that will <br /> require both the use of existing reserves, as well as planned rate increases. <br /> ❑ The City has fixed costs that it must recoup independent of the amount of citywide usage. <br /> ❑ The City has typically applied rate adjustments on an equal percentage basis across various <br /> property types. <br /> Based on these reasons, Staff is recommending the following rate adjustments as shown in the <br /> tables below: <br />