My WebLink
|
Help
|
About
|
Sign Out
Home
2002_1209_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2002
>
2002_1209_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2011 3:50:03 PM
Creation date
10/10/2011 3:35:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exx 'bit 3-B <br /> Page 5 of 13 <br /> Docket No. E002/M-99-799 <br /> RWNorthern States Power Company <br /> Minneapolis, Minnesota 55401 <br /> MINNESOTA ELECTRIC RATE BOOK • MPUC NO. 2 <br /> GENERAL RULES AND REGULATIONS (Continued) Section No. 6 <br /> 10 Revised Sheet No. 29 <br /> 5.3 SPECIAL FACILMES (Continued) <br /> D. Undenaround Facilities Reauirements (Continued) <br /> 3. Perpetual easements wil# be granted Company at no cost to the Company whenever any portion of the <br /> underground distribution system is located on private land. Said private easements also will allow the <br /> Company access for inspection, maintenance, and repair of Company facilities. <br /> 4. The Company must receive, by franchise or permit, full access to its facilities installed underground for T <br /> the purpose of inspection, maintenance, and repair of such facilities, such right of access to include the <br /> right to open public ways. <br /> 5. The Municipality will give sufficient notice and will allow the Company sufficient time to place its T <br /> facilities beneath public ways while the same are tom up for resurfacing. The Municipality shall provide <br /> Company with access to the tom up public ways during such period so that Company will have <br /> unobstructed use of sufficiently large sections of the public ways to allow installation of the <br /> undergruund facilities in an economic*manner. T <br /> 6. Secondary voltage service supplied from an underground distribution lateral installation will require that <br /> the customer install, own, and maintain necessary conduits and secondary service conductors or bus <br /> duct to a point designated by Company within or adjacent to the secondary compartment of the <br /> transformer or vault. Company will make final connection of customer's secondary service conductors <br /> or bus duct to Company's facilities. <br /> 7.' Secondary voltage service supplied from underground secondary service conductors require that the <br /> customer install, own, or maintain necessary conduits on private property to a point designated by the <br /> Company at or near the pmperty line. The secondary service conductors usually will be installed by the T <br /> customer in the customer's conduit, however, in some installations it may be preferred to have <br /> Company provide a continuous installation from the Company facilities through the customer conduit to <br /> the customees service equipment. In these installations the customer must pay the total installed CoSt <br /> of the Company's cable installed on private property. The Company will make the final connection of T <br /> customer's secondary service connectors to Company's facilities. <br /> 8. The customer, group of customers, developer or Municipality will be subject to any charges imposed as <br /> T <br /> a result of the conditions set forth in Section 5.1, STANDARD INSTALLATION and charges for Special <br /> Facilities as provided in this Section 5.3. T <br /> `See page 5 of 8 in redlined copy submitted June 22.2001. <br /> (Continued on Sheet No. 6-29.1) <br /> Date Filed: 06-1 1-02 By: Kent T. Larson Effective Date: <br /> State Vice President -w Minnesota & Dakotas <br /> Docket No. E0021M-99-799 Order Date: <br /> 14158610 <br />
The URL can be used to link to this page
Your browser does not support the video tag.