My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0126_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0126_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 11:18:25 AM
Creation date
10/11/2011 11:00:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR COUNCEL ACTION <br /> DATE. 1/26/98 <br /> 98 <br /> ITEM NO.. C'-'4 <br /> Is <br /> Departme Approval. Manager Reviewed.* Agenda t <br /> Consent: Agenda <br /> Item Descriptiona. Final Payment and Acceptance for Twin Lakes Regional Pond Project <br /> T-9 -14 <br /> Background: on November 25, 1 996, the City Council received the feasibility study and <br /> scheduled a public improvement for construction of a regional pond for the Twin Cafes Area <br /> Project No. T-96-14. on December 16, 1 996 the City Council Meld a public improvement <br /> hearing and on that date ordered the improvement, preparation of plans and specs, received plans <br /> and specs, and authorised advertisement for bids. on January 27, 1997, the City Council awarded <br /> the low hid to F.M. Prattalone Excavating and Grading, Inc, to the amount of$305,007,05. The <br /> actual construction was performed during the spring and summer of 1997. The project was <br /> assessed after the City Council held an assessment hearing on August 11, 1997 and adopted the <br /> assessment roll on September 22, 1997. <br /> Policy objectives: The City policy requires that the following steps be completed to finalize a <br /> construction contract: <br /> 1. A project summary sheet detailing cost and schedule. <br /> 2. Certification from the City Engineer or Consulting Engineer verifying that all of <br /> the work has been completed in accordance with plans and specifications. <br /> 3. A resolution by the City Council accepting the contract and beginning the one-year <br /> waffanty. <br /> Financial s: The follovnng is a summary of project financing: <br /> Work covered by contract. 3 01,923.7 o <br /> Changeorders ................................... ..................................... 0.00 <br /> FINAL CONTRACT TOTAL ............,..,..........................$3011923.70 <br /> Project financed ley: <br /> Assessments ., ................,......, ............ .............. .......... �],�1�.�� <br /> (Regional Pond only) <br /> City of Roseville Storm Utility Fund ...................................$70,409.61 <br /> TOTAL. ......r............•...........r............... . ................$3011923,70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.