My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0126_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0126_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 11:18:25 AM
Creation date
10/11/2011 11:00:26 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4 In conjunction with the application for a conditional use, the following documents <br /> have been submitted and reviewed by staff In preparation of this report: <br /> site development plan, construction site plan, site demolition plan, and <br /> directional signage plan (dated 12/15/97, revised'2/30/97, and <br /> revised 01107/98). <br /> a grading/drainage plan and utility plan (dated 12/15/97) <br /> building elevation and materials-plan (dated 12/15/97) <br /> building floor plan (dated 12/15/97) <br /> landscaping plan (dated 12/11/97, revised 12129197, and revised <br /> 01/07/98); <br /> 2.5 Redevelopment of the site will include the construction of a new 4,295 square foot <br /> Arb 'sl barro Restaurant in the southwest portion of the site. The new restaurant <br /> will have 120 seats, 61 off-street parking spaces, and a drive-through with stacking <br /> capacity. In conjunction with redevelopment of the site, a utility pole along the <br /> frontage road will be moved, the cu rbcuts will be realigned, the existing parking area <br /> to be re-used will be overlaid with 1.5" of bituminous, concrete perimeter curbing will <br /> be installed, catch basins will be installed (site currently sheet drains), additional <br /> landscaping will be installed, the trash enclosure will be removed from the <br /> southwest corner of the site, and the interior circulation of traffic on the site will be <br /> unproved, <br /> 2.6 The exterior of the building will be a light glared stucco/EFIS material with a metal <br /> ca p to match the red of the entry ways. The north, east} and south sides of the <br /> building will have an architectural feature that projects above the parapet wall. <br /> These features include glass panels and a standing seam metal roof in red. Back-lit s will be located over the entry way on the north side of the building, and <br /> above windows on the north, east, and south sides of the building. Building signage <br /> will be located within a sign hand area. <br /> 2.7 While the new facility is being constructed, the applicant proposes to Deep the <br /> � facility existin facili open for a period of 75 to 90 days. There will be a period of two to <br /> three weeks between the time the existing restaurant is closed and the new <br /> restaurant is opened. Franchise Associates maintains that it is imperative to <br /> continue operation of its business during this interim period in order to retain jobs <br /> for its employees and maintain its customer lease. During this construction/interim <br /> period, the number of off-street parking spaces will be reduced to 31. In order to <br /> accommodate this construction/interim period, employees and construction workers <br /> will be required to park off-site. Construction materials and equipment will be limited <br /> to the area delineated on the construction site plan. This construction area will be <br /> fenced in order to provide security and limit access. <br /> 2.8 The applicant has been working with staff since November on the proposed site <br /> p <br /> development plan. In response to concerns, the final site plan has been modified <br /> p <br /> to include a ore-way traffic circulation pattern on site, the realignment of curbcuts <br /> to facilitate traffic flow, the Installation of sig nag a and other visual cues to facilitate <br /> traffic flow, p edestrian access to the building, the installation of additional <br /> PF#2977-RCA(01126198) - Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.