My WebLink
|
Help
|
About
|
Sign Out
Home
1998_0120.ws_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1998
>
1998_0120.ws_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2011 11:42:33 AM
Creation date
10/11/2011 11:35:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br /> -A total of seven bid specifications were mailed to various fire apparatus manufacturers. <br /> -A request for bid was also placed lid the newspaper. <br /> -Only one manufacturer submitted a bid; Pierce Manufacturing. <br /> Some of the bid specifies are as follows: <br /> Base price $513,220 <br /> basis prepayment 44,990 <br /> 60 day pro-completion payment - x,000 <br /> Total $5059230 <br /> Alternative All-wheel Steer bid $233.686 <br /> Final Cost $5289916 <br /> Pierce did list 8 exceptions. All exceptions did meet or exceed the specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.