Laserfiche WebLink
4 <br /> aAWWFL�O der aty of Bosw ile,2660 Civic meter Dr, e,MIS 55113-1899 Date December 8, 1993 <br /> a lm r Arkay construction, � Meedelwohn Av N, Minneapolis,Mai 55427 Change Order Not I <br /> �209""m. Bond Co. 47012011641934 Givens&Assoc,Donald Givens,7900 Xerxes Av #959, Minneapolisp MN 5�431 <br /> CHANGE ORDER NOt 1 <br /> John Rose Minnesota Ice Oval <br /> LA)B - DUUMIN <br /> Pile No.42504 <br /> Descriodon of Work <br /> Part 1 -Alternate fids This work includes Alternate Bid No. 1 and Altennte Bid No,2 which were not accepted at the time t <br /> contrads were prepared. Additional wiam <br /> sceu eous items were added to recount for the delay is adding this work to the contract. <br /> Pan 2 - Snowmel t This work includes all work required to add a snowmelt pit in the adsting arena ice resurfacer room <br /> rcluding, waste heat recovery stem for snowmen heating co , smelt pits and grating, pit drain plumbing, coiliing'door <br /> modifications,eieetiod work, and all related appurtanances. <br /> Part 3 - Sam Belated Modifications This work includes structure and soils corrections rewired due to poor soils=wunt <br /> during building c avation. <br /> Part 4-Building Uvg[ades This work includes building upgrades and modifications requested by the Owner to upgrade <br /> provide additional building functions, and add plumbing and electrical for the concession area. <br /> Part 5 - ExIstigg conditions This work clud catlons rewired to accomodate unforeseen conditions in the <br /> building structure as well as some required structural modifications to the new building. <br /> cam URR Tam <br /> pia rtit Pict A�it <br /> Change Order No. 1 <br /> Part 1 -Alternate Bids <br /> ternate No. l <br /> Change from concrete block to jumbo <br /> brick as an exterior fmisb LS 1 13,x.00 13,x.00 <br /> 2 Upgraded brick/block costs LS I Z495,00 4 <br /> Abate I $159495+ <br /> 4M.CHA -1 <br />