Laserfiche WebLink
t <br /> CAMInat URK TOW <br /> N46 hm Usk F"M Awwo# <br /> Additional soffits LS 1 931.00 931,00 <br /> IP <br /> Total Part 4 $159712,0D <br /> Part 1 -meting Conditions <br /> 24 R HVAC rooftop unit LS 1 (19.303,00) ( <br /> 25 1 11 bottom plate in be= LS 1 274;10 274M <br /> 26 stucco lower cut wan LS 1 19750'00 1,750.11 <br /> T Additional stml lintels LS 1 987.00 987.00 <br /> Pier demolition LS 1, 6DO.06 600000 <br /> Total Part 5 $2�W <br /> Total Part 1 4 <br /> Total Part 2 30741.00 <br /> Total Part 3 19110 <br /> Total Part 4 15,712.00 <br /> Total Part 5 . 00 <br /> Total rdr Not 1 $113# 2,io <br /> Original trot Amount $ 475,000.00 <br /> Previous Chaaga Order 0 <br /> Ww Change der No. 1 - ADD 1139652M <br /> Revd Contrast Amount (including this order) SS%65210 <br /> 42504.CHA -3 <br />