Laserfiche WebLink
f <br /> �T NO 1 <br /> To <br /> JANUARY 14, 1993 SUPPLEa=ART AGREEKENT <br /> BETWEEN <br /> CXTY OF ROSLVILLE <br /> AM <br /> BONESTROO, ROsENE r MDERLIK AND AsSocI TES P INc i <br /> h <br /> T331S j1XMMMqT X0,6 1 is a supplementary agreement made and entered <br /> into as of Octobor 1923. between the City of Roseville, <br /> Minnesota (City) , and Bonestroo, Rosene, Anderlik and Associates, <br /> Inc. (Engineer) This Amendment No. 1 amends the January 14, 1993 <br /> Supplementary Agreement between the City and Engineer (Agreement) <br /> FIB � � and <br /> for engineering services in connection with design <br /> construction of the Ice oval/Bandy link (the Prof ect) . <br /> owner and Architect agree. as follows <br /> lo The scope of the project has been defined by documents prepared <br /> reference to <br /> the Engineer (and incorporated herein by � <br /> y � �design/build � �� and b a <br /> receive proposals on March 15, 1 , <br /> design/build construction , <br /> onstruct ion , contract (incorporated herein by <br /> re f e rence) executed between the City and proposer on <br /> d successful p ro p <br /> May ' <br /> 10, 1593 , The scope of the Project has been 'increased to <br /> include: <br /> a. Site landscaping <br /> b* Sports netting system <br /> c. Scoreboard/lighting/sound system modifications to work <br /> done by others <br /> d, outdoor snowmelt pit <br /> e* - out door sports flooring <br /> f, construction management of work done by others <br /> 2 . The scope of the Engineer' s services has been revised to <br /> reflect the expanded. scope of the Project and in accordance <br /> with the Ci t y r s instructions issued during the pro�gre s s b f both <br /> phases of the Project. <br /> 3 The value of the Prof edt is reflected by the original <br /> design/construction contract award, the alternates added, and <br /> other change orders, approved and in processing, as of the date <br /> of this Amendment totaling 2,185,765, as shown in Exhibit "DH <br /> attached to and incorporated in this amendment No. 1. <br /> Construction costs are not yet a in this <br /> ion available or included� s <br /> total for the outdoor s�nowmelt pit, outdoor sports f loot'in f <br /> and the sports netting system. <br /> 4 , Engineer' s costs for services and expenses on the .Proj ect <br /> and are estimated to <br /> through septe�rber 30y 1553 are $108r977 <br /> increase by $25, 523 to a total of $134F500 by December 15 <br /> 1993 * <br />