Laserfiche WebLink
IMPLEMENTATION TOOLS <br /> ality C.Plan I Orden C.I.P. othel, <br /> IM Railroad lines now in ex i stenee ihoul d be kept and more <br /> fully utilized if possible@ if there is a rail line <br /> abandonment in Roseville, some government aganCy should <br /> acquire the land for public purposes* Roseville should <br /> ensure safety at all highway and pedestrian orossings"M <br /> IM Emergency vehicles should be strategically located <br /> throughout our cammun ity. Emergency vehicle mute S <br /> should be established and marked, and OpticoM (or equal <br /> equipment) should be cans i darad <br /> 10 Light rail planning should receive input from Rsevilla. <br /> Roseville should preserve potential rights-o f way and <br /> station looationst and identify possible routes for <br /> tributary bus service} <br /> The RTB and KTC should make greater use of surveys aino ng <br /> resent and potential transit riders when planning <br /> changes in suburban bus and van services <br /> The RTC and M should provide transit schedules and <br /> � '` p <br /> promotional material to homes and businesses by mail and <br /> newspaper delivery. <br /> YI An integratedt comp <br /> rehensive InotO rued and nanmotarized <br /> transportation plan map for Roseville should be <br /> prepared0 EW <br /> Appoint a standing Advisory Co�nmissinnsistingf two <br /> ��� app � <br /> r$pr <br /> esentatives from each of the vista 2000 Study.grOups tO <br /> advise of future issues presented by the vista 2000 � <br /> prooessi MA <br /> Hl)" <br /> =ui <br /> 4 <br /> MWOMMI <br /> IN <br /> NEIIIIIIIII00, <br /> Ogg ilia Comm D*v Sla"7727M3 <br /> M73— <br />