Laserfiche WebLink
m <br /> REQUEST FOR COUNCIL ACTION DATE: 9-27"-93 <br /> ITEM NO e : <br /> De rtment Approval: manager Re view a A n a ion: <br /> Hearings <br /> Item Descry tionle AcIcent companies Inc. , representing Stan Koch <br /> and sons Inc. , request for a special, use permit <br /> to operate a truck leasing facility at 2507 <br /> Walnut street <br /> Background.0 <br /> On September 231 1 9 9 1, United Trailer Leasing was granted *an <br /> 1 interim truck rental and leasing <br /> interim use permit to operate a <br /> facility at 2 507 Walnut Street for a► two year periode No major <br /> site improvements were proposed or required at that times That <br /> and their property is <br /> interim use permit has now expired <br /> vacant. Stan Koch and sons is now proposing to purchase the <br /> site bring it up to current design standards, and then conduct <br /> _their t ruck leasing s ing opera t ion from the <br /> � � F l"�� location, In order to <br /> do this a special use permit is required. <br /> 2. The ro osed site is 10.3 acres in size and is zoned I-21 <br /> � � <br /> General Industrial* In this district,# the rental or leasing o f <br /> motor vehicles is by special use -permit only e -If the property <br /> were to be p eranently used for this purpose, a permit would <br /> have to be ranted and the property would have to be brought <br /> in p <br /> to compliance iance with the design standards in the Roseville City Code. The specific standards that would 'apply in this case <br /> involve the building material s, site paving, perimeter curb and <br /> tter, and landscaping. currently, the building is metal, the <br /> site is mostly gravel and there is little landscaping on the <br /> site. Chapter 19, design standards of the city code, addresses <br /> each of these issues. <br /> 3. The existin building is proposed to have a complete new <br /> � g i to block base with a <br /> exterior with a decorative rock, concrete <br /> stucco f in i sh panel anel above. - The building's roof will be <br /> redone with a new st and ing seam metal roof i Site work includes <br /> addin g perimeter erimeter security fence, immediately providing bituminous surface and concrete curb and gutter for the visitor <br /> parking area and completing the sur f ac ing and curb and gutter <br /> a <br /> work for the area for the storage of trailers and tractors <br /> wit , <br /> within a year period. Engineering staff has suggested <br /> � <br /> modifications to the drainage plan that would control surface <br /> water on the site and direct it to a system of catch basins and drainage pipes connecting to the City's storm sewer system. <br />