My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0913_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0913_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2011 11:33:29 AM
Creation date
10/13/2011 11:26:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1992 ASSESSMENT SUMMARY <br /> r ECT FEAVENG FINAL OVERIUNDER <br /> PRO JE T TYPE ESTIM ATE E EM ENT ESTIMATE ER AREA DESCRIPTION <br /> 92-01 Diseased tree removal NA 258 to 558 NA <br /> 90-02' 19 Heine] Drive Street reconstruction 18.14/ft 14.69/ft -19.0 <br /> Heinel Circle PMP (25%) (25 ) <br /> 90-11 Heinel Drive Storm sewer 960.20/unit 941.18/unit -1.36 <br /> Heinel Circle i I <br /> 92-2-2 Troseth Road Street reconstruction 1 8.14/ft 14.69/ft -19.0 <br /> PIMP (25%) (25%) l 300 <br /> 92-03 101d Hwy. 8 Street reconstruction 127.42/ft 89.181ft - . <br /> M A (100%) (100%) <br /> 92-04 County Rd. -2 Street reconstruction 1 64.97/ft 122.54.ft -25.7 <br /> 1 'M SA (100%) (100%) <br /> 92-11 Treseth/Old Hwy. 8 Storm sewer 287.06/unit 227.67/unit -20.7 <br /> Co. Fed. -2 <br /> 92-02-64 Sandhurst Street reconstruction 18.141ft 14.691ft -19.0 <br /> RM P (25%) 26 ) <br /> 22-10 Pascal/Commerce merce Street reconstruction 56.97/ft 48.03/ft -15.7 <br /> PIMP 100 (100%) <br /> 92-02-63 hryer/Draper/ Street reconstruction 18.1 Oft 14.69/ft -19.0 <br /> Oxford/Chatsworth P M P (25%) R§-- ) <br /> 92-02-72 Hilltop/Glenwood/ Street reconstruction 18.14/ft 14.69/ft -19,0 <br /> VWoodrufffWestern Ply P (25 (25 ) <br /> 2-12 Hilltop/Glenwood/ storm sewer 621.34/unit 604.48/unit -18.8 <br /> Iloodru#f/Western <br /> 92-02-73 McCarrons St/Shady Street reconstruction 18.14/ft 14.69/ft -19.0 <br /> Beach/Wagner F M P 25 (25%) <br /> 92-13 Mc arrons St/Shady Storm sewer 253.841unit 249.70/un it -1.6 <br /> 1Beach1Wa ner <br /> 2- 2- 4 aitier�M aric� street reconstruction 18.141ft 14.69/ft -19.0 <br /> Woodbridge/Dionne Pull P (25%) (25%) <br /> 2-14 Galfier/Marion/ storm sewer 445.44/unit 323.74/unit -27-32 <br /> Woodbridge/Dionne <br /> 92-06 Terrace Drive Street reconstruction 95,60/ft 88-51/ft -7.4 <br /> (100%) 0 00 ) <br /> Sanitary sewer 61.40/ft 63.94/ft +14.7 <br /> (100%) (1-00%) <br /> 92-25 Terminal Road Railroad Tier 1 2001ac 2161ac +8.0 <br /> crossing (70%) 0 <br /> improvement Tier 2 400/ac 432/ac +3.0 <br /> go%) (70%) <br /> Front foot 14.631ft 16.881ft +8.5 <br /> (70%) go%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.