My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0913_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0913_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2011 11:33:29 AM
Creation date
10/13/2011 11:26:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AFAS BI�IIIIIIIV itVl'�P`'�VI'L'�V�'olll�lil3535 VADNAIS CENTER DRIVE, 0 SEH CENTER.ST PAUL,JINN 55110 612 49�-200 800 325-2055 <br /> 'f r' <br /> ARCHITECTURE ENGINEEPING + ENVIRONMENTAL TRANSPORTATION <br /> September 8, 1993 1E: city of Roseville <br /> Lincoln Drive construction <br /> City Project #93-10 <br /> County Ditch 1o. 4 <br /> City Project Igo* 93-20 <br /> EH File 1o. A-1OSEV95.00 <br /> Mr. Steve Gatlin <br /> Director of public Works <br /> City of Roseville <br /> 2660 Civic center Drive <br /> Roseville, MIS 5511 <br /> Dear Steve: <br /> On September 2, 1993 construction bids were received for the above-referenced project. <br /> Seven bids were received with the base bid amounts ranging from $652,377.19 to <br /> $796,000.00. The bid form consisted of a base bid and two alternate bids: Add Alternate <br /> A and Add Alternate B. The add alternates considered two styles of railing required at <br /> the top of the modular block retaining walls. Add Alternate A is an ornamental style <br /> railing and Add Alternate B is a metal pipe style railing' Attached two this letter are <br /> two drawings showing each railing style. The bid documents identify the low bid as the <br /> sum of the base bid and the Add Alternate selected by the Owner. We have reviewed <br /> the bids and find that the bid submitted by Arnt Construction remains the low bid <br /> regardless of the alternate selected by the Council. The following is a summary of the <br /> contractors who bid the project and the amount of their bid: <br /> Add Alternate <br /> Contractor Ease lid A E <br /> Arnt Construction $652,377.19 $30,227.50 $26,081,25 <br /> Northdale construction $696,510-96 $33,705.00 $28,890.00 <br /> Arcon Construction $704,451.04 $88,810.00 $ <br /> C. S. Mc rossan Construction $749,948.76 $48.r310-50 $20{784.75 <br /> Palda & Sons $768,297.30 $52,965.00 $29,425-00 <br /> W. B. Miller, Inc. $795,174.85 $32,100.00 $29,425.00 <br /> Earle Construction $796,000.00 $3800,50 $28,736.25 <br /> SHORT ELLIOTT MADISON.W1 <br /> HENDRIC CSON INC. MINNEAPOLIS.MN ST CLOUD.D. N CHIPPEWA FALLS.wf <br />
The URL can be used to link to this page
Your browser does not support the video tag.