Laserfiche WebLink
APPENDEK B <br />BUDGET" <br />*Cost are based on the assumption that the Village of Shoreview will <br />provide an equal Level of funding for work at Lake Owasso, and that <br />removal at Lake Owasso and the CederhoTm Golf Course will be done in <br />1992 and 1994. <br />Per Capture Site <br />Costs: <br />Per Capture Location. Costs <br />].992 <br />1993 <br />1994 <br />1995 <br />Salaries (program coordination <br />and monitoring) <br />49000 <br />3,250 <br />4,000 <br />3,250 <br />Travel and shipping <br />- 1,0000 <br />750 <br />1,000 <br />750 <br />TOTAL <br />$5,000 <br />49000 <br />5,000 <br />4,000 <br />The City of Roseville <br />authorizes the transfer of funds <br />between <br />subaccounts. <br />*Cost are based on the assumption that the Village of Shoreview will <br />provide an equal Level of funding for work at Lake Owasso, and that <br />removal at Lake Owasso and the CederhoTm Golf Course will be done in <br />1992 and 1994. <br />