My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0322_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0322_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:41:56 AM
Creation date
10/18/2011 1:20:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Gatlin <br />March 18, 1993 <br />Page 3 <br />Plans and specifications will conform to the <br />.report recommendations and modifications approved <br />by the City Council at the conclusion of the <br />public hearing. <br />Compensation for the above services shall he on an hourly basis <br />based on the total payroll cost of personnel assigned to the <br />project* <br />Compensation for the report phase is estimated to.he $57,000. <br />Compensation for the plans and specifications 'phase La -estimated <br />to he <br />Eegmerit A 4 3 r 6OO <br />Segment E 213 x 100 <br />Segment c 264400 <br />Total 9980100 <br />The above engineering costs are based on the following: <br />1. county Road Cww2 will. he the access to T.H. 51,v <br />2. Feasibility report public hearing will he held <br />spring 19930 <br />3* Segment A will he constructed in 1993. <br />Segment B and c will he constructed in 19194 under a <br />single construction contracts <br />5* Roadway a 1 igpment of Lincoln Drive will conform to the <br />February 23,, . 1993 College Properties., Inc. alignment <br />for that portion north of county Road C- 2 and the <br />northowsouth alignment proposed in the.SEH Feasibility <br />Report dated July 9. 1990 for that portion south l of <br />County Road -P,0 <br />It is agreed that upon - reaching the estimated cost, the Engineer <br />will notify the City and confer with representatives of the city <br />to determine the basis for completing the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.