My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0309.special_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0309.special_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:18:24 AM
Creation date
10/18/2011 1:42:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />1993 PMP <br />3/3/93 <br />1. Program conforms to Pavement Management Program goals--rebuild 4 to <br />5 miles of "Problem" residential streets per year and provide <br />required maintenance of permanent "'problem" streets with curb and <br />gutter, <br />2. Project costs financed according to assessment policy, <br />3, Construction standards met for proposed street widths, utility <br />replacements, etc. <br />Financial Implications: The attached sheet summarizes the total <br />estimated construction cost for all 1993 + PMP projects, The table <br />includes costs for all projects for which general obligation improvement <br />bonds will be sold and the projects assessed. The table does not <br />include Municipal State Aid projects which do not require outside <br />bonding. The annual ]pond to finance the PMP has been 2 to 2.5 million <br />dollars per year including local street projects as well as any city <br />contribution for Ramsey county or MnDOT reconstruct ion ' proj ect s . The <br />proposed program is within past budget guidelines. <br />Schedule: For projects ordered at the larch 9 and 9. 1993, public <br />hearings, we suggest the following schedule: <br />Mar. 1 - Mar. 26 Plan . preparation period <br />Mar. 22 or Mar. 29 Approval of lilans and specifications and <br />authorization to advertise for bids <br />Mar. <br />26 <br />& Apr. 2 <br />Ad for bids in Construction Bulletin <br />Mar, <br />30, <br />Apr. 6 & 13 <br />Ad for bids in Roseville review <br />Apr. <br />21 <br />& 22 <br />Bids opened <br />Apr. <br />22 <br />- 23 <br />Review bids <br />Apr* <br />26 <br />Bids awarded <br />May <br />to <br />Start construction <br />Staff Recommendations: Staff recommends the council order all public <br />improvements heard on March 9, 1993: <br />RECOMMENDED COUNCIL ACTION: <br />Adoption of resolution ordering projects P-93-02, Neighborhood 62; <br />P- 93 -04, Neighborhood 62; P -93 -0, Neighborhood 66; P-93-02 and T- 93 -07, <br />Neighborhood 58; and P- 93 -06. <br />
The URL can be used to link to this page
Your browser does not support the video tag.