Mmstimated 1993 Construction Bond Summary* <br />PMP Neighborhood <br />Street Cost <br />Storm Cost <br />Total Cost <br />58 <br />521,657 <br />180,105 <br />701,762 <br />59 <br />97,914 <br />0 <br />87,914 <br />60 <br />617,596 <br />0 <br />617,596 <br />62 <br />275,834 <br />0 <br />275,834 <br />66 <br />166,653 <br />0 <br />166,653 <br />Ramsey County Project <br />Hamline Avenue 1 185,084 30,492 215,576 <br />TOTAL 1 1,864,738 1 210,597 1 2,075,335 1 <br />' These estimates include PMP bonded projects only. <br />Estimates Include a 10% contingency factor but do <br />not include engineering or financing costs. <br />MSA projects are not included in this summary. <br />