My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0216.ws_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0216.ws_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:01:24 AM
Creation date
10/18/2011 2:22:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUAE"RY <br />1Ue key components of the ropostd Rosedale Ares IVHS/HOV Project <br />arse summarised below. <br />Projo Area: Includes ft Rosedale Regional Shopping Center, the <br />au oond i ng commercial area% and the ern Pl oymen t arm to the <br />west and north of Rosedale., <br />Tmnswrtation Frohlerns: Mw primary problems in the &= <br />include tfaff c congestion the —� L mdway system, aerial <br />system, and on 0 inadeq Date <br />interchanges to serve the anc and hck of pefeterW aVeaclosive <br />facilities for ale who MeL <br />lest Qbjectives: The objectives to reds congestion* <br />improve convenience and Mort for zwdy area n rs, provide <br />exclusive facilities for ride-s increase operational efficiency, <br />.improve safety, improve air quality, and improve productivity of <br />and service vehicles in the area. <br />&Msed Pro "ect SMSgs and once ts: Basic concepts include an <br />A'I'MS for RosedWe, an HOV interchange on TH 36, and increased <br />f amities for transit is <br />Proiect Ph h proposed gW would be implemented in the <br />following phases: concept mition/pr�eliminary design, plan <br />arationlinitial �nre� pientaton, sect <br />evalnadon+ and full dept oyr t. { <br />institutional AmngM1nr. ne Cty of would complete <br />the projects within the context of the Mn/DOT Guidestar Program <br />and in cooperation with the R IC Regional shopping Center, <br />Ramsey County, MnDOT Metro District, and the Metropolitan <br />Transit Comminion. <br />Project Frinaal : The estimated cost of Cont Definition <br />and P mliminary ign for Stages IA and E3 is $15090001b <br />Olson I <br />
The URL can be used to link to this page
Your browser does not support the video tag.