m1 1
<br />Effective 1 -1 -2004
<br />Buildine Permit Fee:
<br />Permit fees are to be based on job cost valuation. The determination of value or valuation shall
<br />he made by the building official. The value to be used in computing the building permit and
<br />building plan review fees shall be the total of all construction work for which the permit is
<br />issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air
<br />conditioning, elevators, fxe- extinguishing systems and any other permanent equipment.
<br />TOTAL VALUATION
<br />FEE
<br />$1.00 to $500.00
<br />$25.00
<br />$501.00 to $23000.00
<br />$25.00 for the first $500.00 plus $3.25 for each
<br />additional $100.00, or fraction thereof, to and
<br />I
<br />including $2,000.00
<br />$2,001.00 to $259000 woo
<br />$73.50 for the first $2,000.00 plus $14.75 for each
<br />additional $ l ,coo _00, or fraction thereof, to and
<br />4
<br />includiniz $25,000.00
<br />$25,001 -00 to $503,000.00
<br />$415.75 for the first $25,000.00 plus $10.75 for each
<br />additional $1,000.00, or fraction thereof, to and
<br />including $50,000.00
<br />$503001.00 to $ 10o,000.00
<br />$682.50 for the first $50,000.00 plus $7.50 for each
<br />additional $1,000.00, or faction thereof, to and
<br />including $1 00,000,00
<br />$100 ,� 1. o to $5005000.00
<br />$105 3,50 for the first $100,000.00 plus $6.00 for each
<br />additional $1,000.00, or fraction thereof, to and
<br />including $500,000.00
<br />$500,001.00 to $ 1,000,000.00
<br />$3,427,75 for the first $500,000.00 plus $5.00 for
<br />each additional $1,000.00, or fraction thereof, to and
<br />I
<br />mcluding $1,000,000.00
<br />$17000,001.00 and up
<br />$5,945.25 for the first $1,000,000.00 plus $4.00 for
<br />each additional $ 1,000.00, or fraction thereof
<br />Other Inspections and Fees:
<br />1. Inspections outside of normal business hours ..............
<br />+ + ................ $47.00 per hour
<br />(minimum charge — two hours)
<br />2. Reinspection fees assessed under provisions of the NIN Mate
<br />BuildingCode ■ ... .. ■ ■ . ■ ■ ■ ■ .. . .. ■ ... ■ . ■ ■ ■ .. ■ ■ ■ ■ ■ ...
<br />. . w ■ . ■ ■ ■ ■ . D4 o w e s ■ . a .. . + + . , ■... ..$47.00 per hour
<br />3. Inspections for which no fee is specifically indicated.................... ...S47.00 per hour
<br />(minimum charge -- one -half hour)
<br />4. Additional plan review required by changes, additions
<br />or revisions to plans......... + .....................
<br />! . .... . ................... * ....$47.00 per hour
<br />(minimum charge — one -half hour)
<br />5. For use of outside consultants for plan checking, inspections
<br />andsimilar costs ..................................... ... ......................if..T7!l.
<br />14...................3 ......Actual cos t
<br />'Actual costs include administrative and overhead costs.
<br />
|