My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1215_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1215_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 9:16:33 AM
Creation date
10/19/2011 10:10:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
set forth in Section 901.06 of this chapter, except as modified in M. .B. . Section 13000 <br />(Ord. 111 0.) 4-13-1992) <br />The plan review fees specified are separate fees from the permit fees specified and are in <br />addition to the permit fees. <br />When submittal documents are incomplete or changed so as to require additional plan review <br />or when the project involves deferred submittal items an additional plan review fee shall be <br />charged at the above rate. <br />Expiration of plan review. Applications for which no permit is issued within 180 days <br />following the date of application shall expire by limitation, and plans and other data <br />submitted for review may thereafter be returned to the applicant or destroyed by the building <br />official. The building official may extend the time for action by the applicant for a period not <br />exceeding 180 days on request by the applicant showing that circumstances beyond the <br />control of the applicant have prevented action from being taken. No application shall be <br />extended more than once. In order to renew action on an application after expiration, the <br />applicant shall resubmit plans and pay a new plan review fee. <br />Refund Fee <br />The building official may authorize refunding of any fee paid hereunder which was <br />erroneously paid or collected, <br />The building official may authorize refunding of not more than 80 percent of the permit fee <br />paid when no work has been done under a permit issued in accordance with this code. <br />The building official may authorize refLmding of riot more than 80 percent of the plan review <br />fee paid when an application for a permit for which a plan review fee has paid is withdrawn <br />or canceled before any plan reviewing is done. <br />The building official shall not authofize refunding of any fee paid except on written <br />application filed by the original permittee not later than 180 days after the date of fee <br />payment. <br />Sewer Connection Permit Pee: <br />e Residential $50.00 <br />e Commercial $150.00 <br />a Repair $35.00 <br />e Disconnect $50-00 <br />Sign Permit Fee: <br />*Utilize building permit fee schedule <br />• No plan review fee <br />• Minimum fee $35.00 <br />wimmin ool Permit Fee: <br />e Utilize building permit fee schedule <br />Water Connection Permit Pee: <br />e Residential <br />1;� <br />$50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.