My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1215_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1215_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 9:16:33 AM
Creation date
10/19/2011 10:10:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE r 12/15//03 <br />ITEM ISO.: X1. D. <br />Department Approval: Manager Reviewed: �i�eada section+ <br />Consent <br />Item Description: Awarding Bids for 2003 pond Maintenance Project <br />Background: The City's overall storm water system contains 96 Lakes, ponds and wetlands. The <br />Public works staff has completed an inventory of the storm water basins throughout the City. As a part <br />of this inventory the condition of each basin was rated. we have been budgeting money annually for <br />storm sewer maintenance, including sediment removal in ponds. This project includes sediment delta <br />removal from the following basins, Bennett Labe, Charlie Fond, Long Lake Pond, Oasis Fond, and Villa <br />ia-r Pond, See attached map for locations. Bids were solicited during late November, and were opened <br />on Wednesday, December 10, 2003. <br />Policy Implications: Based on past practice, the City Council has awarded the contract to the lowest <br />responsible bidder. In the case of this project, the apparent low bidder is Jar Brothers, of Forest Lake, <br />Minnesota. <br />. Financial implicationse, The engineer's estimate for the 2003 pond Maintenance Project was $98,000. <br />We received 7 bids for this improvement. The low bid submitted by Jar Brothers is $5,000 lower than <br />the cngineer }s estimate. The following is a list of the bids received: <br />av Brothers <br />Park Construction Co, <br />Arnt Construction Co. <br />Don Zappa and Sons <br />rattalone Excavatin <br />rairie Civil Constructors <br />Total Bid <br />$93,000 <br />$121,750.0o <br />$144,580.00 <br />$1499,275.00 <br />$1591100.00 <br />$1,62327835500.00 <br />*due to some misplaced numbers, this bid is considerably higher than the others. <br />The majority of this project, $86,800, will be funded using City storm utility funds. Grass Labe watershed <br />District will provide the additional funding, $6,200, for the remov s at har ie ond. <br />I <br />Approval of a resolution awarding bid for T -03 -12 Pond Maintenance Fro. ect in the amount of $93,000 to <br />Jay Brothers, of Forest Lake, Minnesota. <br />Prepared bar: Debra Bloom <br />
The URL can be used to link to this page
Your browser does not support the video tag.