My WebLink
|
Help
|
About
|
Sign Out
Home
2003_1117_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_1117_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 8:35:03 AM
Creation date
10/19/2011 2:07:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Other <br />Traffic: <br />This Phase 2 will increase the traffic scenario for the sanctuary and the school. <br />Sanctuary: Sunday a three services currently proposed at 8:00} 9:30 and 11 :00. <br />School: Monday -- Friday, there. are 2 five -gear cycles that are in sync with the <br />Roseville public school system: <br />Early cycle: Start at 8:50a.m. / dismiss at 3:1 Op. �. <br />Late cycle: Start at 9: 0a.rte. / dismiss at :40p.m. <br />Snow Removal-, <br />nmk.e from the north pat-king pat-king lot kvi l l be plowed to the OLIth green -circa and to the <br />north pon di n g area. <br />End of N arI`tlt i ve . <br />
The URL can be used to link to this page
Your browser does not support the video tag.