Laserfiche WebLink
15: City Staff have been maintaining the City Code in -house for the past six months. There <br />are no monies for this activity (beyond Staff time already budgeted) included in the proposed <br />budget.. <br />16: The estimated cost of repairing the wading pool is $5,000 - $10,000, assuming only the <br />main drain is in need of repair. This repair is being made in 2003. The annual operating costs <br />are approximately $6,000, including approximately $3,000 in overtime. On a typical day, <br />several hundred people use the wading pool throughout the season. <br />17: The current budgeted amount is $15,000. <br />18: The current budget includes an additional $107,000 for building maintenance costs. This <br />includes heating, air conditioning, electricity, janitorial, and light maintenance. The estimate is <br />based on the City's current operating costs applied to the additional space being constructed for <br />City Hall and the Public works Building. The estimate represents a full year} s worth of heating <br />in some of the newly expanded areas, and approximately six (6) months worth of higher costs in <br />other maintenance areas. The estimate also assumes a reduction in janitorial services in all <br />employee areas, allowing continued emphasis to be placed on the public areas such as meeting <br />rooms, bathrooms, lobby, and Council Chambers. <br />19: There is no appropriation for new pathway construction in the 2004 Proposed Budget. <br />The proposed budget for pathway maintenance on existing pathways is $1 35,000, the same <br />amount as 2003. <br />20: There are no monies for a citizen survey *Included in the proposed budget.. <br />1: It was suggested that the City reduce the wrap printing costs by $23,000, by reducing the <br />frequency and the use of multi- colors. It was also suggested that the City reduce the employee <br />newsletter costs by $10,000 by ernailing the distribution and make only a handful of copies. This <br />practice has been in place for the past gear, at a cost of approximately $100 annually. it's <br />uncertain as to homer rnuch savings would result from the wrap being generated four times a year <br />versus six. The City would need to re -bid the reduced volume. Funding for the wrap comes <br />from the City's cable franchise fees and will not produce any tax levy savings. <br />2; Approximately $100,000 is budgeted to replace small equipment items such as office <br />equipment, police equipment, BA's, pagers, software, oval padding, etc. that are at the end of <br />their useful life. Reducing the funding would delay the purchases to a subsequent year which in <br />some eases may create a safety concern, and would require the City to continue using equipment <br />beyond their expected lives. <br />3* Maintaining and insuring the Aggressive Slate Farb costs approximately $8,000 to <br />$10,000 annually, and is used by approximately 2,500 participants each season. The Slate Farb <br />equipment is in need of annual updating and extensive repairs. Staff estimates that <br />approximately $50,000 will be needed in the near future to replace /update the equipment. The <br />slate park does serve a very unique group of individuals in our community who often do not <br />participate in other activities. <br />Attachment A 5 <br />