Laserfiche WebLink
10. Cover types,. Estimate the acreage of the site with each of the following cover types before and after development: <br />Before After Before After <br />Types 1.8 wetlands Lawn/landscaping <br />Wooded/forest - -- - Impervious surfaces - -- - <br />Brush/Grassland - - -- Other (describe) <br />Cropland _ <br />TOTAL <br />1IWIIII�II�IINN�INN�INN�INN�INN�INN�INN�INN�I�I�I�I�I�I�I�IIIIIII�IIIIIIII�� <br />If Before and After totals are not equal, explain why: <br />11. Fish, wildlife and logically sensitive resources <br />a. Identify fish and wildlife resources and habitats on or near the site and describe haw they would be affected by the project. <br />Describe any measures to be taken to minimize or avoid impacts. <br />b. Are any state - listed (endangered, threatened, or special concern) species, rare plant communifes or other sensitive ecological <br />resources such as native prairie habitat, colonial waterbird nesting colonies or regionally rare plant communities on or near the <br />site? ❑ Yes ❑ No <br />If yes, describe the resource and how it would be affected by the project. Indicate if a site surrey of the resources has been <br />conducted and describe the results. If the DNR Natural Heritage and Nongame Research program has been contacted give the <br />correspondence reference number: . Describe measures to minimize or avoid adverse impacts. <br />" ^ �w++++ ronw :"rYlYIYIYVlwwwlsimlvmlemra <br />12. Physical impacts on water resources. Will the project involve the physical or hydrologic alteration dredging, filling, stream <br />diversion, outfal l structure, diking, and impoundment — of any surface waters such as a lake, pond, wetland, stream or drainage <br />ditch? ❑ Yes, ❑ No <br />If yes, identify water resource affected and give the DNR Protected waters Inventory number(s) if the water resources affected are <br />on the PWI. lY/ Y/ JµnlY»»I YAY/ UD)D NNIIYIVIVVVVVVVVVVVV IV1 Y/UD)..D ) ..WN»YIIYIIYIIYIIYIIVIIVIIVIIVI - Describe alternatives considered and proposed mitigation measures to miruirnize impacts. <br />13. water use. will the project involve installation or abandonment of any water wells, copnection to or changes in any public water <br />1 <br />supply or appropriation of any ground or surface water (including dewatering)? ❑ Yes "❑ No <br />If yes, as applicable, give location and purpose of any new wells; public supply affected, changes to be made, and water quantities <br />to be used; the source, duration, quantity and purpose of any appropriations; and unique well numbers and DNR appropriate <br />permit numbers, if known. Identify any existing and new wells on the site map. If there are no wells known on site, explain <br />methodology used to determine. <br />14. Water - related land use management districL Does any part of the project involve a shoreland zoning districts a delineated 100- <br />year flood p1ain, or a state or federally designated wild or scenic river land use district: ❑ Yes ❑ No <br />If yes, identify the district and discuss project compatibility with district land use restrictions. <br />15. Water surface use. will the project change the number or type of watercraft on any water body? ❑ Yes ❑ No <br />If yes, indicate the current and projected watercraft usage and discuss any potential overcrowding or conflicts with other uses. <br />3 <br />