Laserfiche WebLink
recyclable materials processing operations. The Contractor shall report actual <br />percent process residuals disposed, and the disposal facility or facilities utilized for <br />disposal} with each monthly billing statement. If the process residuals maximum <br />is exceeded for any month, the report shall include the types and amounts of <br />materials landfilled or incinerated, the reason .for the l andfilling or incineration, <br />and the steps being taken by Contractor to avoid landfill or incineration. <br />7, process Residuals Characterization <br />8. Estimating Materials Composition as Collected <br />9. End Market Certification <br />The Contractor shall provide at least quarterly written certification to the City that <br />all recyclable commodities identified are indeed recycled and not disposed. Such <br />written certification shall identify all end markets used for each of the recyclable <br />K <br />