My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0818_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0818_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 9:54:39 AM
Creation date
10/21/2011 9:14:17 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 49.4 &1 0J - * To - a 011 9 [91#1 N Q Lei I <br />M a 114I:3:OX <br />ITEM: DC. A. <br />Department Approval: Manager Reviewed: Agenda Section: <br />r <br />Organizational Business <br />Item Description: City Center Building Project Update Approve Contract Awards for Certain <br />Bid Groups within Bid Package #3, City Mali and Public works Maintenance Facility Project <br />BACKGROUND: <br />On .Tune 2, 20035 the Council approved the first bid package for the site work for the City Hall <br />addition and for the Maintenance Building project. Bid Package #2 was awarded on June 30, <br />2003. This bid package includes the building excavation, the east -in -place concrete for footings <br />and foundations and floors, precast concrete for walls and floors, structural steel for walls and <br />roofs, and structural steel erection. <br />Bid Package #3 included interior and exterior finishes, mechanical and electrical, roofing, and <br />landscaping. These bids were opened on August 11, 2003. This bid package included 38 hid <br />groups for various components of the proj <br />
The URL can be used to link to this page
Your browser does not support the video tag.